Similar Projects
Camden Baker Apartments
New Construction - 214,991 SF
Conception
Denver, CO 80223

Evans West
New Construction, Demolition - 715,000 SF
Conception
$160,000,000 est. value
Denver, CO 80204

4055 North Elati Street Mixed Use
New Construction - 67,476 SF
Design
Denver, CO 80110

4345 46th Street Apartments
New Construction - 123,880 SF
Design
$10,000,000 CJ est. value
Denver, CO 80212

Peoria Crossing II
New Construction - 89,770 SF
Bidding
Aurora, CO 80010

Bmc- Copperleaf
New Construction
Sub-Bidding
Aurora, CO

Parterre
New Construction
Post-Bid
Thornton, CO 80602

Girard Apartments
New Construction - 21,213 SF
Post-Bid
$2,500,000 est. value
Aurora, CO 80231

Architectural Engineering Services-Overlook at Thornton Apartments
Addition
Results
Less than $16,000,000 est. value
Denver, Thornton, CO 80260

Redevelopment of .39 Acres of Land
New Construction, Renovation
Results
Northglenn, CO 80233

Aspire Aprtments
New Construction - 93,283 SF
Construction
$61,000,000 est. value
Westminster, CO 80031

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

The Cameron
New Construction
Pending Verification
Denver, CO

Springs at Pena Station
New Construction
Pending Verification
Denver, CO 80249

2150 South Monaco Parkway Mixed-Use Development
New Construction - 20,000 SF
Conception
Denver, CO

Reported 02/12/2022 12:00 AM
Project Title

MHCD 10Th & Sheridan Apartments

Physical Address View project details and contacts
City, State (County) Denver, CO 80204 (Adams, Denver Counties)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding, Construction Start Expected third quarter 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Apartments/Condominiums, 3 Stories Above Grade, 43,828 SF New Construction, 60 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents