Similar Projects
Hodgeville Booster Pump Station
New Construction
Bidding
GA

Loganville Water Transmission System Improvements
Bidding
Loganville, GA 30052

Towne Lake and Benton Lift Station Upgrade and Sewer Infrastructure
Post-Bid
Pooler, GA 31322

Peachtree Mobile Home Park Pump Station Improvements
Post-Bid
Sugar Hill, GA

Phase I Entrance Road
Results
Savannah, GA 31400

Chattahoochee River Intake Pump Station
Results
Atlanta, GA 30303

Rocky Creek Trunk Sewer Pumping Station
Construction
Augusta, GA 30900

Central Avenue Lift Station Rehabilitation Project
Renovation
Bidding
Savannah, GA 31406

Chemical Feed System Installation
Post-Bid
College Park, GA

SEDA Manufacturing Center Master Lift Station and Force Main and Offsite Water Extension
Results
Less than $5,338,048 est. value
Savannah, GA

PS4036 Gravity Basin CIPP Rehabilitation
New Construction
Bidding
Brunswick, GA 31520

Water Line, Sewer Line, Lift Station
Post-Bid
Waynesboro, GA

South Cobb WRF Influent Lift Station Recovery - Construction Management Services
Results
Marietta, GA 30060

Pump Station Bypass Connections
New Construction, Term Contract
Bidding
Thomson, GA 30824

Construction of J.W. Smith Water Production Plant High Service Pump Station Upgrades
Post-Bid
Hampton, GA 30228

Reported 11/22/2019 12:00 AM
Project Title

Lift Station No. 7 Improvements

Physical Address View project details and contacts
City, State (County) Thomasville, GA 31792   (Thomas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $385,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consist of furnishing all labor, materials and equipment necessary to construct the proposed Lift Station No. 7 Improvements as shown on the construction drawings. In general, construction consists of: demolition of the existing lit station dry pit; modification of the existing wet well; installation of two submersible pumps, piping, valves, fittings, stand-by power unit; site work, fencing, by-passing of existing sanitary sewer flows; installation of curb and gutter with drainage piping; roadway widening; and all associated measures for the complete project.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents