Similar Projects
Reported | 01/05/2022 12:00 AM |
Project Title | Beverly Elementary and Hickey Elementary Renovations |
Physical Address | View project details and contacts |
City, State (County) | Allen, Plano, TX 75074 (Collin County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | $535,000 |
Plans Available from | Municipal Agency - 11/21/21 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of: Beverly Elementary School - Replace 5 packaged roof top units and provide new connections to existing ductwork, electrical, condensate, gas piping, etc. Disconnect and reconnect existing controls. Provide new roof curbs. Replace existing domestic boiler system with Instant Hot Water Heaters. Provide new circulation pump a re-pipe to existing domestic cold water, hot water supply/return and gas piping. Provide new flue routed thru existing flue roof penetration. Repair/replace wall behind dishwasher in kitchen area. Provide new dishwasher and booster heater. Replace rusted metal wall framing and provide new finishes on wall to match existing. Estimate Budget - $ 385,000 Hickey Elementary School - Repair/replace wall behind dishwasher in kitchen area, receiving room and kitchen utility closet. Provide new dishwasher and booster heater. Replace rusted metal wall framing and provide new finishes on wall to match existing. Provide new VCT flooring and cove base in receiving room and utility closet. Estimate Budget - $ 150,000 |
||||||||||||||||||
Details | Elementary School, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |