Similar Projects
2021 Gas Collection and Control System (GCCS) Expansion at Seminole Road MSW Landfill
Term Contract
Bidding
GA

2022 Natural Gas Reliability Upgrades
Infrastructure
Bidding
Dalton, GA

Sodium Bisulfite Tank Replacement at Pole Bridge Wastewater Treatment Plant
Post-Bid
Lithonia, GA 30038

Natural Gas System Replacement - Park Ave
Post-Bid
Fort Valley, GA 31030

Propane Air Mix Plant Emergency Reserve
Results
Robins Afb, GA

Decommission and Remove Terminal Underground Fuel Tank
Results
Savannah, GA 31408

Proposed Gas Main Improvements to Serve Proposed Industrial Park
Infrastructure
Bidding
Bainbridge, GA

Fuel Pumps And Controls
Post-Bid
Columbus, GA 31901

Natural Gas Pressure Improvement Project
Results
Less than $758,945 est. value
Lawrenceville, GA 30046

Natural Gas Services For Various Dawson County Buildings
Alteration
Bidding
GA

Fuel Management System
Post-Bid
Springfield, GA

Above Ground Fuel Tank
Results
Moultrie, GA 31776

Twin Lakes Gas Main Extension
Infrastructure
Bidding
Bainbridge, GA

2021 Natural Gas Reliability Upgrades
Post-Bid
Dalton, GA 30722

Stone Mountain Street Gas Line Relocation Project
Results
Less than $319,961 est. value
Lawrenceville, GA 30046

Reported 02/23/2022 12:00 AM
Project Title

Public Works Fueling Station System

Physical Address View project details and contacts
City, State (County) Winder, GA   (Barrow County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Work required under this Contract includes furnishing materials, labor, equipment, etc. for the installation of 20,000-GAL, dual wall fuel tank [14,000-GAL gasoline & 6,000-GAL diesel], twin fuel dispensers, fuel management system with fuel card or fob readers and employee ID code, software and all associated electrical materials, etc.to provide a complete and operable system to be located within the City of Winder as indicated in construction documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents