Similar Projects
Bridge Replacement - Oak Street - City of Dover
Demolition, New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Rollinsford, NH 03869

Water Main Replacement - Littleworth Road - City of Dover
Infrastructure
Conception
$3,600,000 CJ est. value
Dover, NH 03820

74 Main Street Mixed Use Building
Demolition, New Construction, Infrastructure - 31,000 SF
Design
$4,000,000 CJ est. value
Durham, NH 03824

74 Main Street Mixed Use Building
Demolition, New Construction, Infrastructure - 31,000 SF
Design
$4,000,000 CJ est. value
Durham, NH 03824

2022 Paving
Infrastructure
Post-Bid
$50,000 est. value
Barrington, NH

UNH Field House West Lot Parking Lot Site Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Durham, NH 03824

Bellamy Ridge (Red Barn Drive) Completion
Infrastructure
Results
Dover, NH 03820

Pavement Preservation, US 4 NH 4 NH 11 NH 108
Infrastructure
Results
$4,681,619 est. value
Rollinsford, NH

Dover Court
New Construction, Renovation
Construction
$6,600,000 est. value
Dover, NH 03820

Fownes Mill Condominiums
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Rochester, NH 03867

Cocheco Mixed-use Development
New Construction, Infrastructure - 25,000 SF
Pending Verification
$200,000,000 CJ est. value
Dover, NH 03820

Cocheco Mixed-use Development
New Construction, Infrastructure - 25,000 SF
Pending Verification
$200,000,000 CJ est. value
Dover, NH 03820

Street Reconstruction - Oak/Ham/Ela - City of Dover
Infrastructure
Conception
$2,000,000 CJ est. value
Dover, NH 03820

Central Avenue Apartments
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Dover, NH 03820

High Street (Route 9) Corridor Signal Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Somersworth, NH 03878

Last Updated 01/25/2023 04:19 AM
Project Title

Wadleigh Road Apartments

Physical Address View project details and contacts
City, State (County) Rochester, NH 03867   (Strafford County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Further scope has not been released. As of October 2022, this project is in the planning stages, and waiting to receive site plan approval from the Rochester Planning Board. Information regarding the selection of an architect has not been provided and this project is bid out. A firm timeline has not been established, however; construction is hopeful to begin in the spring of 2023. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

17,455 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents