Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 North - Independence Avenue to 600 West - City of Provo
Alteration
Conception
$600,000 est. value
Provo, UT 84606

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Redwood Road Sewer- Grandview Blvd To Ring Rd
Infrastructure
Bidding
$150,000 CJ est. value
Saratoga Springs, UT 84045

2022 Pavilion Improvements Project
Demolition, New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Orem, UT 84057

Saratoga Dignity Care Assisted Living - Rebid
New Construction, Infrastructure - 61,420 SF
Sub-Bidding
$20,000,000 CJ est. value
Saratoga Springs, UT 84045

Sanctuary
New Construction, Infrastructure
Sub-Bidding
$155,000,000 CJ est. value
Lehi, UT 84043

Harvest View Park Phase 2 - Site Construction
Renovation
Post-Bid
Santaquin, UT

Santaquin Zone 11W Tank and Booster Pump CM/GC
New Construction
Post-Bid
Santaquin, UT 84655

World-Wide Water Storage Tank Remediation
Term Contract
Results

Power Department Building
Results
Salem, UT 84653

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Last Updated 08/09/2022 07:33 AM
Project Title

4 MG Lower Tank

Physical Address View project details and contacts
City, State (County) Eagle Mountain, UT 84005   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project in general consists of construction of a new 4MG post-tensioned reinforced concrete tank along with all appurtenances and site piping. Also included is the reinforced concrete building for the tank piping and valves. Bids shall be addressed and delivered to Eagle Mountain City prior to the Bid Opening. Any bid received after the scheduled closing time for receipt of bids will be returned unopened. All questions to go through electronically. Question Submission Close Date 8/26/2022 12:00 PM MDT

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents