Similar Projects
Strategic Planning and Operational Flexibility (SPOF) Support
Term Contract
Design
Saint Marys, GA - Bangor, WA 31558

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

On-Call Geotechnical Engineering Consulting Services
Term Contract, Infrastructure
Post-Bid
$150,000 est. value
WA

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Winslow Water Tank Replacement
Infrastructure
Bidding
Bainbridge Island, WA

Engineering Consultant Services for On-Call Geotechnical Services
Term Contract
Post-Bid
WA

Winslow Water Tank Replacement Project
Term Contract, Alteration
Bidding
Bainbridge Island, WA

6th Street Pavement Preservation Phase III
Term Contract, Infrastructure
Post-Bid
Bremerton, WA 98337

Ruth Haines Roadway Design Project
Infrastructure
Bidding
WA

Electrical Engineering Services
Infrastructure
Post-Bid

A/E Professional Services for Bethel Phase 1 - Street Improvement Project
Infrastructure
Post-Bid
Port Orchard, WA 98366

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Reported 12/11/2021 12:00 AM
Project Title

Transportation Planning and Civil and Structural Engineering Design

Physical Address View project details and contacts
City, State (County) Bremerton, WA 98312   (Kitsap County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The West Kitsap Way Planning Study is intended to outline transportation network improvements for West Kitsap Way from Chico Northlake Way to SR 3. The study will identify a set of improvements for multimodal travel that includes transit, freight, cars, bicycles, pedestrians, and other active transportation modes. Technical requirements and qualifications for consultants include transportation planning, civil design, survey, public outreach, and an understanding of Complete Streets. The planning study shall document the purpose and need for improvements, develop and screen a range of alternatives, identify a preferred alternative for transportation improvements for the corridor, and provide detailed conceptual plans and estimates for the selected alternative.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents