Similar Projects
MLK Streetscapes - City of Auburn
Infrastructure
Conception
$5,155,950 CJ est. value
Auburn, AL 36832

MLK Streetscapes - City of Auburn
Infrastructure
Conception
$5,155,950 CJ est. value
Auburn, AL 36832

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

College of Education Building - New Facility
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Auburn Univ, AL 36849

Lee Road 296 Paving Improvements
Infrastructure
Post-Bid
Smiths Station, AL 36877

Lee Road 246/Mullin Road Improvements (Mill Creek)
Infrastructure
Post-Bid
Smiths Station, AL 36877

ten Hoor Stair Improvements
Alteration
Results
$225,000 est. value
Tuscaloosa, AL 35401

2021 NCAT Liquid Pavement Supply and Delivery of Asphalt Binder
Infrastructure
Results
Auburn, AL

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

RV Roadway of Opelika Service Building
New Construction, Infrastructure - 11,250 SF
Conception
$3,000,000 CJ est. value
Opelika, AL 36801

Jay and Susie Gogue Performing Arts Center - Auburn University
Addition, Demolition, Infrastructure
Design
$5,000,000 CJ est. value
Auburn, AL 36832

Last Updated 11/04/2022 09:09 AM
Project Title

Lake Wilmore Multi-Purpose Fields - City of Auburn

Physical Address View project details and contacts
City, State (County) Auburn, AL 36830   (Lee County)
Category(s) Entertainment/Recreation, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of construction of four multi-purpose fields sized and designed to accommodate football, lacrosse and soccer games and practice as well as baseball/softball practice. Project scope includes fields, field lighting, restroom/ storage building, parking and space dedicated for food trucks/mobile concessions. This project is in included in the City of Auburn FY 2023-2024 Capital Improvements Plan. As of November 04, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Screening Devices, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents