Similar Projects
New Connector Construction/Project is Located 0.47 Mile West Of I- 395 and Route 1A /Extending 6.05 Miles Roughly Parallel to the Brewer-Holden Town Line
Infrastructure
Bidding
Brewer, Eddington, ME 04428

Asphalt Paving Services for the Penobscot Job Corps Center
Post-Bid
Bangor, ME 04401

Vinny Norwood Road Improvements Phase 2
Renovation
Post-Bid
Old Town, ME 04468

Pavement Grooving and Polyurea Painting
Results
Augusta, Bangor, Bowdoin, Bowdoinham, Brewer, Brunswick, Freeport, Gardiner, Oakland, Richmond, Sidney, Topsham, Waterville, Yarmouth, ME 04401

On Call Milling Machines and Grinders
Results

Hot Mix Bituminous Asphalt Pavement
Post-Bid
Hampden, ME

Construction and Paving Project
Results
Hermon, ME

Pavement 2021 Project
Infrastructure
Post-Bid
Brewer, ME

Pavement Milling, Hot Mix Asphalt Overlay, Bridge Work, with Drainage and Safety Improvements
Results
Medway, Sherman, ME 04460

Paving
Infrastructure
Post-Bid
Medway, ME 04460

FY 2021 Paving Program
Results
Bangor, ME 04401

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Post-Bid
$25,000 to $100,000 est. value

Pavement 2020
Results
Bangor, ME

Z--Brush,Grade,Drain Philpott Bridge Road
Term Contract
Post-Bid
Millinocket, Penobscot, ME 04462

Bridge Work, Pavement Milling, Ultra-Thin Bonded Wearing Course, Hot Mix Asphalt Overlay with Safety Improvements
Results
Bangor, Carmel, Hampden, Hermon, Newburgh, Old Town, Orono, Veazie, ME 04401

Last Updated 10/13/2021 09:58 AM
Project Title

Munson Road Improvements, Phase VI

Physical Address View project details and contacts
City, State (County) Orono, ME 04473   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of roadway reconstruction and realignment of approximately 300’ of existing bituminous roadway at the University of Maine on Munson Road beginning at the terminus of the Munson Road Phase V project. The work will involve removal of existing pavement, earthwork, gravel installation, roadway and sidewalk paving, granite curbing, and roadway underdrainage. The work will also include roadway lighting. Due to the close proximity of College Avenue, coordination with the Town of Orono shall be expected.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents