Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Maine South HS Synthetic Turf Replacement
Post-Bid
Park Ridge, IL 60068

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Sidewalk, Curb
Results
Hanover Park, IL

Site Paving
Post-Bid
Elgin, IL 60120

2021 Crack Routing and Sealing
Results
Hanover Park, IL

Northwest Parking Lot Improvements
Post-Bid
IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Community Athletic Fields Concrete ADA Ramp
Post-Bid
Elk Grove Village, IL

Crack Filling/Seal Coating/Striping at Triphahn Center Parking
Results
Hoffman Estates, IL 60169

Removal and Replacement Existing Damage Sidewalk, Curb and Gutter
Post-Bid
Bartlett, IL

Last Updated 08/08/2022 12:33 PM
Project Title

Designed Overlay, ADA Improvements and Rumble Strip

Physical Address View project details and contacts
City, State (County) La Grange, IL 60525   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $3,271,012 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(22,113-Ft) Designed Overlay, ADA Improvements and Rumble Strip located on Willow Springs Road from IL. 171 (Archer Ave) to North of 55th St. in Cook County. DESCRIPTION OF PROJECT The scope of this project is pavement resurfacing (Designed Overlay) and ADA sidewalk ramp Improvement, new shoulders, and milled rumble strip. The work to be performed under this contract shall consist of pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, placement of pavement markings, installation of sidewalk ramp improvements, and all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. Region 1 District 1 Federal Project # N/A County(s) Cook Key Route(s) FAU 2697 Marked Route(s) Willow Springs Road Section(s) 2021-019-RS-SR&SW State Job #(s) C-91-154-21 PPS #(s) 1-79106-0000 Completion Date : 65 Working Days Questions not accepted as of July 26, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, July 15, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 013 - Designed Overlay, ADA Improvements and Rumble Strip

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earth Stripping and Stockpiling, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Rigid Paving Rehabilitation, Concrete Overlays, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents