Last Updated 02/23/2021 10:19 AM
Project Title

HPW-Abandonment of Bering and San Felipe Lift Stations

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,573,123
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of approximately 2,100 linear feet of 30-inch along San Felipe (between Bering Drive and Fountain View Drive), 210 linear feet of 36-inch(between San Felipe No.2 Lift Station and Fountain View Drive), and 4,400 linear feet of 48-inch along Fountain View Drive(between San Felipe Street and Westheimer Road) using trenchless construction. This project scope will also include installation of a local collector sewer ranging in size from 8-in to 18-in using trenchless construction along Bering Drive. Additionally, the work will transfer existing sanitary services along Augusta Drive and Westheimer Drive that are presently connected to the 36-inch monolithic RCP (to be abandoned) to the existing sanitary sewers that will remain after construction of this project.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents