Similar Projects
Last Updated | 02/23/2021 10:19 AM |
Project Title | HPW-Abandonment of Bering and San Felipe Lift Stations |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77002 (Harris County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $20,573,123 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of the construction of approximately 2,100 linear feet of 30-inch along San Felipe (between Bering Drive and Fountain View Drive), 210 linear feet of 36-inch(between San Felipe No.2 Lift Station and Fountain View Drive), and 4,400 linear feet of 48-inch along Fountain View Drive(between San Felipe Street and Westheimer Road) using trenchless construction. This project scope will also include installation of a local collector sewer ranging in size from 8-in to 18-in using trenchless construction along Bering Drive. Additionally, the work will transfer existing sanitary services along Augusta Drive and Westheimer Drive that are presently connected to the 36-inch monolithic RCP (to be abandoned) to the existing sanitary sewers that will remain after construction of this project. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |