Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

Oakmead, Redwood, And Outlet Mall Lift Station Upgrades - C66501923 - City Of Petaluma
Renovation
Conception
$1,800,000 est. value
Petaluma, CA 94952

BVF Comfort Station and Water Supply
New Construction
Design
$1,000,000 to $5,000,000 est. value
Yosemite National Park, CA

Walnut Avenue Pump Station
New Construction
Design
$880,000 est. value
Simi Valley, CA 93063

Pump Station Recovery Mitigation Project
Renovation
Bidding
Long Beach, CA

1.3 MG Fleming Zone 8 Reservoir and Zone 8 to 9 Pump Station
Renovation
Bidding
$13,000,000 est. value
Irvine, CA

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Bridalveil Fall Comfort Station & Water Supply
New Construction
Post-Bid
Yosemite Lakes, CA

Plant Structural Improvements
New Construction
Results
$2,500,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Results
Elk Grove, CA 95757

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

Pump Station Rehabiliatation - Station 1 - City of Simi Valley
Renovation
Design
$1,600,000 est. value
Simi Valley, CA

Lone Pine Booster Station and Water Storage Project
Renovation, Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Lone Pine, CA

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Reported 07/08/2022 12:00 AM
Project Title

P Street Lift Station Upgrade and Modification

Physical Address View project details and contacts
City, State (County) Live Oak, CA 95953   (Sutter County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 to $4,250,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of demolition of a portion of existing facilities, construction of a new wet well, installation of 3 new submersible wastewater pumps, with associated valves, piping, and a flowmeter with associated vaults, replacement of the existing motor control center, backup generator, and other electrical improvements, replacement of gravity wastewater piping and structures, a new perimeter cement masonry unit wall with two access gates, improvements to the electrical and controls building including a new roof, asphalt paving of the site, drainage infrastructure, and other various improvements. The contractor is required to keep the existing facilities operational until the new facilities are commissioned, and flow rerouting and/or bypass pumping will be required.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents