Similar Projects
FTA Sidewalk Project Hardy Street - Kamper Park
Infrastructure
Design
$1,450,000 CJ est. value
Hattiesburg, MS 39401

RFQ D/B - New Parking Garage at the G.V. Montgomery VA Medical Center
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Jackson, MS 39216

Water System Improvements
Infrastructure
Bidding
$508,000 CJ est. value
Bassfield, MS 39421

Water System Improvements
Infrastructure
Bidding
$508,000 CJ est. value
Bassfield, MS 39421

Dollar General #24582 / Batesville
New Construction, Infrastructure - 10,640 SF
Sub-Bidding
$2,000,000 CJ est. value
Batesville, MS 38606

Tucker Road Regional Pump Station 6 SRF Improvements
Post-Bid
Pascagoula, MS

Vicksburg Waterline Protection
Post-Bid
Vicksburg, MS 39180

Weymouth Hall EWP Project - City of Natchez
Results
$150,098 est. value
Natchez, MS 39120

City of Indianola Utility Relocation
Results
Indianola, MS

MS Highway 18 Utility Relocation
Infrastructure
Construction
Utica, MS 39175

MS Highway 18 Utility Relocation
Infrastructure
Construction
Utica, MS 39175

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

Silo Square District Lofts (Apts)
New Construction, Infrastructure - 238,514 SF
Design
$50,000,000 CJ est. value
Southaven, MS 38672

Sherman Street Overlay Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Sherman, MS 38841

Lift Stations Modifications
Renovation
Post-Bid
MS

Last Updated 07/28/2022 09:34 AM
Project Title

New Sanitary Sewer Force Main, Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Lake, MS 39092   (Scott County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Concrete, Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $348,550 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 28, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The work generally consists of, but is not limited to. Installation of a New Sanitary Sewer Force Main, Construction of a Concrete Chlorine Contact Chamber, New Disinfection system, Pump Station Rehabilitation, and other related items. The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. Contract time shall be 150 consecutive calendar days from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed in the amount of the actual costs incurred for each consecutive calendar day beyond the specified contract time. Special Damages: In addition to the amounts provided for liquidated damages, expenses and other losses, Contractor, in the event of such default, shall pay to the Owner the actual costs, expenses and other losses reasonably incurred by Owner. Bidder must be qualified under Mississippi Law and show current Certificate of Responsibility issued by the Mississippi State Board of Public Contractors establishing his classification as to the value and type of construction on which he is authorized to bid. Each Bidder shall write his Certificate of Responsibility Number on the outside of the sealed envelope containing his proposal. Proposals be submitted in duplicate, sealed and deposited with the Town of Lake, Mississippi prior to the hour and date hereinbefore designated. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Each Bidder must submit with his proposal a separate attachment stating his qualifications to perform the work. The Statement of Qualifications shall list past projects of similar size and nature, a list of references with name and telephone number, a list of key personnel who will perform the work, and other information supporting the Bidder's qualifications. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of 100 percent of the contract amount. Contract Drawings, Contract Specifications, Instructions to Bidders and Bidders Proposal Forms are on file and open to public inspection in the office of the Clerk of Town of Lake, Mississippi. Awarding public contracts to non-resident Bidders will be on the same basis as the non-resident Bidder's state awards contracts to Mississippi Contractors bidding under similar circumstances. In order to ensure that Mississippi's so-called Golden Rule is followed state law requires a non-resident bidder to attach to his bid a copy of his resident state's current laws pertaining to such state's treatment of non-resident contractors. Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent of his bid, payable to the Town of Lake, Mississippi, as bid security. Bidders shall also submit a current financial statement, if requested, by the Town of Lake, Mississippi. Minority and women's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities, equipment, material and/or supply needs. The Town of Lake is an Equal Opportunity Employer. The Town of Lake hereby notifies all Bidders that it will affirmatively insure that in an contract entered into pursuant to this advertisement will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other legally protected status in consideration for an award. The Town of Lake reserves the right to reject any and all bids and to waive any informalities or irregularities therein.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents