Similar Projects
Grassy Creek South - Section 2
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Indianapolis, IN 46239

Replace Superstructure
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Portage, IN 46368

EHRM Infrastructure Upgrades Construction Project
Term Contract, Infrastructure, Renovation
Bidding
$20,000,000 CJ est. value
Marion, IN 46953

Demolition
Demolition, Infrastructure
Sub-Bidding
$190,000 CJ est. value
Muncie, IN 47305

Water Distribution Updates
Infrastructure
Post-Bid
Goodland, IN

Expansion Connection Unit Related to the Water Meter Replacement
Infrastructure
Post-Bid
Carmel, IN

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

I-65 and SR 267 Interchange Water Main Relocation
Results
Less than $344,800 est. value
Whitestown, IN

RFP Engineering - Project Development Services
Demolition, New Construction, Infrastructure
Pending Verification
$9,455,774 CJ est. value
Rushville, IN 46173

RFP Engineering - Project Development Services
Demolition, New Construction, Infrastructure
Pending Verification
$9,455,774 CJ est. value
Rushville, IN 46173

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$1,170,000 CJ est. value
New Harmony, IN 47631

Virginia Street Water Main Replacement
Alteration
Post-Bid
Shelbyville, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

RFQ Design - Co-location Campus Accommodating Both Schools
New Construction, Infrastructure
Pending Verification
$375,000,000 CJ est. value
Indianapolis, IN 46204

RFP Engineering - City of Bloomington Downtown Curb Ramps,Phase 3
Infrastructure
Bidding
$530,000 CJ est. value
Bloomington, IN 47405

Last Updated 08/08/2022 06:31 PM
Project Title

South Main Street Water Main Replacement

Physical Address View project details and contacts
City, State (County) Seelyville, IN 47803   (Vigo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes the installation of approximately 2,400 lineal feet of new 12" water main along Main Street from US40 to just south of Terry Avenue. The Base bid shall also include all site restoration, erosion control, maintenance of traffic, and all other ancillary work required to complete the project as generally designed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents