Similar Projects
Seawall Repair
Results
Everglades, FL

Runway 5/23 Drainage Improvements Naples Municipal Airport
Results
$4,051,103 to $4,177,228 est. value
Naples, FL 34104

Central Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir Project
Post-Bid
$100,000,000 to $250,000,000 est. value
Everglades, FL

Beach Tilling Services
Post-Bid
Marco Island, Naples, FL 34102

Design Build Step 1-Immokalee Area Improvements - Tiger Grant
Post-Bid
$16,400,000 est. value
Immokalee, FL 34142

BCB Cypress Canal Control Structure 1
Post-Bid
$3,280,900 to $3,626,200 est. value
FL

Repair of Lake Erosion Areas
Results
Naples, FL 34113

Kaicasa - Concrete Box Culvert
Post-Bid
Immokalee, FL

Citywide Lake Restoration
Results
Less than $2,500,000 est. value
Naples, FL 34102

Odor Control Structure Drain Improvements
Results
Naples, FL 34109

NCWRF Sludge Floor Drains Improvements
Results
Less than $34,300 est. value
Naples, FL 34109

Freedom Park Bypass Ditch Project-Grant Funded
Results
Less than $2,000,000 est. value
Naples, FL 34105

Shore Protection Project, Segment III Beach Renourishment 2020-2021, Broward County, Florida
Results
$50,000,000 to $60,000,000 est. value
Everglades, FL

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Picayune Strand Restoration Project, US41 and CR92 Conveyance Features
Post-Bid
$5,000,000 to $10,000,000 est. value
Goodland, FL

Last Updated 12/02/2020 08:45 PM
Project Title

Collier Beach Renourishment 2020-2021

Physical Address View project details and contacts
City, State (County) Naples, FL 34108   (Collier County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,750,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project entails the transportation, placement, and grading of beach compatible sand to renourish the north section of Naples Beach. Location: The nourishment will extend from DEP range monuments R-22+300 to R-37 at Vanderbilt Beach/Pelican Bay, from R42 to R43+500 at Clam Pass Park, from R-43+500 to R- 54+400 at Park Shore, and from Doctor’s Pass to R-79 at Naples. The nearshore disposal area extends from R-60 to R-61+800. The Doctor’s Pass Dredging Complex is located between R-57 and R-58. These activities are located in Collier County, Sections 04, 09, and 16, in Townships 50 South, Range 25 East; Sections 05, 08, 16, 21, 28, and 33, in Townships 49 South, Range 25 East; and Sections 20, 29, and 32, in Townships 48 South, Range 25 East, within Doctor’s Pass or the Gulf of Mexico, Class III waters. The T1 offshore borrow area is located in federal waters.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents