Similar Projects
0.68 MI of Hot Mix Asphalt Cold Milling and Resurfacing and Pavement Markings on South Union Street from the North Parma Village Limits to the South Parma Village Limits
Bidding
Parma, MI 49269

0.32 MI of Hot Mix Asphalt Reconstruction, Concrete Curb and Sidewalk
Bidding
Jackson, MI

Mechanic, Pearl And Green Street Improvements
Post-Bid
Springport, MI

Summit Township LRP 4 Proposal
Post-Bid
MI

0.75 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter and Sidewalk and Pavement Markings
Results
MI

I-94 Reconstruction - University Region (DB)
Results
Less than $30,800,000 est. value
MI

Asphalt Pavement Crack Treatment
Bidding
Jackson, MI

Cold Patch
Post-Bid
Albion, Battle Creek, Clarklake, Jackson, Marshall, Parma, Pleasant Lake, MI 49068

0.50 MI of Hot Mix Asphalt Cold Milling, Resurfacing and Reconstruction, Earthwork, Aggregate Base, Drainage, Concrete Curb, Gutter, Sidewalk and Barrier, Guardrail, Bridge Reconstruction with 36 Inch
Results
MI

HMA Resurfacing for Cold-In-Place Recycling
Post-Bid
MI

Up to 108.24 Lnmi of Hot Mix Asphalt Crack Treatment and Overband Crack Fill on Various Trunkline Routes, Hillsdale, Ingham, Jackson, and Lenawee Counties
Results

Blackman-Summit Township LRP 4 Proposal
Post-Bid
MI

McDevitt Avenue Roadway Reconstruction, Contract A
Results
Less than $1,884,028 est. value
Jackson, MI

Blackman Township LRP 2W Proposal
Post-Bid
MI

1.02 MI of Hot Mix Asphalt Cold Milling and Single Course Overlay with Sidewalk ADA Ramp Upgrades, Signing, and Pavement Markings on M-50 from Constitution Street
Results
Brooklyn, MI 49230

Last Updated 01/29/2020 09:09 AM
Project Title

Bus Facility - Lyle Torrant Center - Paving Project

Physical Address View project details and contacts
City, State (County) Jackson, MI 49201   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all labor, materials, tools, equipment and services necessary to complete work including but not limited to the following: earth moving, paving, seeding, etc.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents