Similar Projects
Last Updated | 07/25/2022 11:11 AM |
Project Title | Moroni Culinary Water Project 2022 |
Physical Address | View project details and contacts |
City, State (County) | Moroni, UT 84646 (Sanpete County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,144,018 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | There is approximately 7,000 feet of pressurized pipeline that connects three culinary wells to a new tank and an existing tank. A new 500,000-gallon concrete water tank will be constructed and connected to the existing water system. A junction box will be installed to divert overflow from the tank to the irrigation storage pond. The existing pump line will be retrofitted to pump water to this junction box, and the new pump line will also be capable of connecting to the junction box. 3,800 feet of gravity flow pipe will convey water from the junction box to the irrigation storage pond. The new well (Well #4) will be equipped, and a new well house constructed at the well site. . Questions Deadline – May 16, 2022, 3:00 PM |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |