Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

New Intracoastal Waterway Bridge - City of Orange Beach
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Orange Beach, AL 36542

RFQ Design - Gulf Coast Engineering Research Station - New Building
New Construction, Infrastructure
Bidding
$7,600,000 CJ est. value
Orange Beach, AL 36561

Belforest Water System - Water Main Improvements County Road 13
Infrastructure
Bidding
$400,000 CJ est. value
Daphne, AL 36526

Country Club Drive Water Main Replacement Phase A- Wedgewood Drive to Fairway
Infrastructure
Post-Bid
$300,000 CJ est. value
Daphne, AL 36526

Flygt Pumps for Lift Station
Renovation
Post-Bid
Daphne, AL

Career Tech Academy - (Site Package Only)
New Construction
Results
$4,763,000 est. value
Loxley, AL 36551

Site Preparation and Prescribed Burns
Infrastructure
Results
Gulf Shores, AL

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Live Oak Estates
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

Circle K / Daphne
New Construction, Infrastructure - 10,374 SF
Bidding
$1,500,000 CJ est. value
Daphne, AL 36526

Last Updated 09/30/2022 06:02 PM
Project Title

Construction of Lift Station Rehabilitation for Fairhope Sewer Upgrade Phase I

Physical Address View project details and contacts
City, State (County) Fairhope, AL 36532   (Baldwin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,841,155 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Services will include, but may not be limited to, construction services to deliver a complete: Lift Station Rehabilitation- The complete replacement of the following three (3) lift stations: North Section, South Section, and Thompson Hall; The rehabilitation /repair of the following three (3) lift stations: North Mobile, Pier & Mobile, and White Grove. Three hundred and sixty-five (365) calendar days will be allowed for the completion of the project. Firms submitting proposals are solely responsible for meeting submittal deadlines. Proposals received after the stated deadline will be deemed non-responsive and will not be considered for any contract awarded as a result of this solicitation. Proposals deemed responsive will be evaluated and an award decision will be made by the City Council. A contract will be awarded to the qualified applicant whose proposal is determined to be the most advantageous to the City of Fairhope. The City reserves the right to reject any or all proposals, and to waive any irregularities or informalities in the proposal process. Questions or comments pertaining to this proposal must be presented in writing, or sent as e-mail to the attention of Andrew Bobe, PE, project engineer, Dewberry Engineers Inc., 25353 Friendship Rd, Daphne, AL 36536, e-mail: abobe@dewberry.com Seventy-two (72) hours prior to the proposal opening or may be forever waived.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents