Similar Projects
109 Chevis f/k/a Ogeechee Road
New Construction
Conception
Savannah, GA 31400

Avemore
New Construction
Conception
Villa Rica, GA 30180

King's Park Pickleball Court 2020
Bidding
Saint Simons, GA 31522

George Pierce Park Improvements
Bidding
Suwanee, GA 30024

Design / Build Services For Community Park
New Construction
Post-Bid
Lake City, GA

Burke County High School Bleacher Replacement
Post-Bid
Waynesboro, GA 30830

Desota Park Renovations - Tennis/Basketball Court Reconstruction
Results
Less than $312,194 est. value
Gainesville, GA

Mary Ross Park Splash Pad and Play Area
Results
Brunswick, GA

Johnson Park Gymnasium Renovations
Construction
Conyers, GA

Satilla Park Infrastructure Improvements
Construction
Douglas, GA

Marian
New Construction
Conception
Macon, GA 31210

Chattooga High School Tennis Courts
Bidding
Less than $350,000 est. value
Summerville, GA 30747

Sports Field Renovations - Phase III
Post-Bid
Evans, GA

Lowndes High School Track Resurface
Results
Valdosta, GA

Savannah Harbor - Infrastructure - Phase I
New Construction
Conception
$130,000,000 est. value
Savannah, GA 31421

Last Updated 12/21/2018 01:05 PM
Project Title

Magnolia Park Storm Drainage, Water Utility and Roadway Improvements

Physical Address View project details and contacts
City, State (County) Brunswick, GA   (Glynn County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $117,050
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project Locations: The roadways included in the scope of this project are Pinewood Drive, Woodland Way, Formosa Circle, Poinsettia Circle, Cherry Street, Peachtree Street, Tara Lane, and a portion of Habersham Street. Consist of surveying and engineering services necessary to complete the storm drainage, water utility, and roadway improvements on the designated streets in the Magnolia Park subdivision. The required tasks shall include: Utility Location - All existing underground utilities shall be located by an established utility location subcontractor. This comprehensive utility locate shall include water, sanitary sewer, storm drainage, gas, electric, communication, and any other underground utilities in the project area. Surveying - Topographic surveying of the existing features of the project area including roadway, curb, driveways, utilities as mentioned above, storm drainage inlets, and any other features within the apparent right-of-way. Topographic cross sections shall be provided at intersections, storm drain crossings and 50 ft. each side, and at 100 foot intervals along roadways. Storm drain pipes shall be located at the roadway crossing and at the existing ditches on each end of the crossing. Boundary surveying is not included in the project scope. Engineering and Design - Produce construction plans sufficient to complete the water utility, storm drainage, and roadway improvements. Existing water lines shall be properly abandoned in place and replaced as designated (see exhibit). Existing corrugated metal storm drain pipes and associated inlets shall be replaced in same location, pipe size, and invert. Existing asphalt pavement and aggregate base shall be removed and replaced with improved pavement section. Curb and gutter shall be removed and replaced in locations to be determined by the City. Firm shall also prepare opinion of probable construction cost. Proposal shall include progress meetings at completion of existing condition survey, 60% design completion and 90% design completion. Construction Administration - Firm shall provide necessary project specification and bid documents sufficient for advertising and accepting contractor bids. Firm shall also provide contract administration services to assist with tasks such as pre-construction meeting attendance, pay requests, change orders, etc. Firm shall also provide periodic construction observations and Erosion and Sedimentation Control inspections as required. Proposal shall also include production of Record Drawings (roadway/drainage, water, and sewer). Proposed fees for these CA services can be provided on an hourly basis.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Controls, Temporary Erosion and Sediment Control.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents