Last Updated | 12/21/2018 01:05 PM |
Project Title | Magnolia Park Storm Drainage, Water Utility and Roadway Improvements |
Physical Address | View project details and contacts |
City, State (County) | Brunswick, GA (Glynn County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $117,050 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Locations: The roadways included in the scope of this project are Pinewood Drive, Woodland Way, Formosa Circle, Poinsettia Circle, Cherry Street, Peachtree Street, Tara Lane, and a portion of Habersham Street. Consist of surveying and engineering services necessary to complete the storm drainage, water utility, and roadway improvements on the designated streets in the Magnolia Park subdivision. The required tasks shall include: Utility Location - All existing underground utilities shall be located by an established utility location subcontractor. This comprehensive utility locate shall include water, sanitary sewer, storm drainage, gas, electric, communication, and any other underground utilities in the project area. Surveying - Topographic surveying of the existing features of the project area including roadway, curb, driveways, utilities as mentioned above, storm drainage inlets, and any other features within the apparent right-of-way. Topographic cross sections shall be provided at intersections, storm drain crossings and 50 ft. each side, and at 100 foot intervals along roadways. Storm drain pipes shall be located at the roadway crossing and at the existing ditches on each end of the crossing. Boundary surveying is not included in the project scope. Engineering and Design - Produce construction plans sufficient to complete the water utility, storm drainage, and roadway improvements. Existing water lines shall be properly abandoned in place and replaced as designated (see exhibit). Existing corrugated metal storm drain pipes and associated inlets shall be replaced in same location, pipe size, and invert. Existing asphalt pavement and aggregate base shall be removed and replaced with improved pavement section. Curb and gutter shall be removed and replaced in locations to be determined by the City. Firm shall also prepare opinion of probable construction cost. Proposal shall include progress meetings at completion of existing condition survey, 60% design completion and 90% design completion. Construction Administration - Firm shall provide necessary project specification and bid documents sufficient for advertising and accepting contractor bids. Firm shall also provide contract administration services to assist with tasks such as pre-construction meeting attendance, pay requests, change orders, etc. Firm shall also provide periodic construction observations and Erosion and Sedimentation Control inspections as required. Proposal shall also include production of Record Drawings (roadway/drainage, water, and sewer). Proposed fees for these CA services can be provided on an hourly basis. | ||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |