Similar Projects
Softball Hall of Fame Capital Reserve - 2801 North East 50th Street (Ward 7) - City of Oklahoma City
Renovation, Term Contract
Conception
$700,000 est. value
Oklahoma City, OK

First Americans Museums Landing
New Construction
Conception
Oklahoma City, OK

HVAC Maintenance and Repairs - 5813 South Robinson Avenue
Term Contract
Sub-Bidding
$22,000 CJ est. value
Oklahoma City, OK 73109

HVAC Systems Water Treatment Program
Alteration
Post-Bid
Oklahoma City, OK

Annex Building HVAC Replacement
Alteration
Post-Bid
Oklahoma City, OK 73117

Z1da--635-22-148 Correct Research Ventilation System (Va-21-00026378)
Results
Oklahoma City, OK 73104

HVAC Maintenance and Repair Project
Results
$200,000 est. value
Oklahoma City, OK

MMAC ANF-1 Replacement Chiller and Cool - Mike Monroney Aeronautical Center (Ward 3)
Renovation, Alteration
Conception
$1,420,000 est. value
Oklahoma City, OK 73169

Will Rogers Elementary HVAC Replacement
Alteration
Post-Bid
Oklahoma City, OK 73142

J041--Chiller #2, #3, & #4, Repair Oklahoma City VA Health Care System Oklahoma City, OK 73104
Term Contract
Results
Oklahoma City, OK 73104

S21-041 H53 Systems Furniture
Term Contract
Post-Bid
Oklahoma City, OK 73145

Central Middle School - 2021 HVAC Renovation
Alteration
Results
Edmond, OK 73034

PAA Boiler
Term Contract
Post-Bid
Oklahoma City, OK 73145

Chiller Panel Removal and Replacement
Alteration
Results
$116,000 est. value
Oklahoma City, OK 73102

Purchasing and Installation of Air Handler Unit
Alteration
Post-Bid
Oklahoma City, OK 73195

Last Updated 08/04/2022 03:35 PM
Project Title

V11H Series Commercial Cast Iron Boiler Repair

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73105   (Oklahoma County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) HVAC, Museum
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $57,000 [brand] Estimate
Plans Available from Project Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of 8/4/2022, no bids were received for this project. A timeline for rebidding has not been established. The editorial content team is seeking more information. Contact Person(s) for Questions: OHS: Edward Taylor - 405-522-0705 - etaylor@okhistory.org Rebekah Pennington - rebekah.pennington@omes.ok.gov

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Cast-Iron Boilers.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents