Similar Projects
Last Updated | 07/19/2021 05:13 PM |
Project Title | T.R. 122 Over Stone Quarry Creek Bridge |
Physical Address | View project details and contacts |
City, State (County) | Carlyle, IL 62231 (Clinton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $284,523 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 320 FT (0.061 Miles); Removal of the existing bridge and construction of a new single span recast prestressed concrete deck beam bridge and approach roadway improvements. 1. Tree Remov Acres - 0.25 Acre 2. Earth Excavation - 300 Cu Yd 3. Channel Excavation - 288 Cu Yd 4. Agg Surf Cse b - 380 Ton 5. Rem Exist Struct - 1 Each 6. Pipe Culvert Remov - 21 Foot 7. Structure Excavation - 71 Cu Yd 8. Concrete Structures - 30.4 Cu Yd 9. Concrete Encasement - 3.6 Cu Yd 10. p p Conc Dk Bm 21 Dp - 1410 Sq Ft 11. Reinf Bars, Epoxy Ctd - 4840 Pound 12. Steel Rail Ty s1 - 104 Foot 13. Fur Stl Pile Hp10x42 - 190 Foot 14. Name Plates - 1 Each 15. p Cul Cl a 1 15 - 30 Foot 16. Contr Low-Streng Matl - 24 Cu Yd 17. Mobilization - 1 l Sum 18. Stone Dmp Rip c a4 Sp - 227 Ton 19. Traf Cont & Prot Spl - 1 l Sum 20. Fence Removal - 180 Foot 21. Set Piles In Rock - 10 Each |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |