Similar Projects
Whiteland Community High School
Renovation
Design
$150,000,000 est. value
New Whiteland, Whiteland, IN 46184

Camp Atterbury ORTC Vehicle Maintenance Facility
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Edinburgh, IN 46124

Camp Atterbury MFGI ORTC Head Quarters Addition
Addition, Demolition, Infrastructure
Bidding
$1,000,000 CJ est. value
Edinburgh, IN 46124

Central Nine Career Center Improvements Multi Purpose Building & Welding Lab
Renovation, Addition - 19,500 SF
Post-Bid
$4,750,000 est. value
Greenwood, IN 46143

Indian Creek HS Fieldhouse, Auditorium, Sports Tower
Addition
Post-Bid
Trafalgar, IN 46181

Pleasant Grove Elementary School
Renovation, Addition
Results
$3,000,795 est. value
Greenwood, IN 46142

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Construction Inspection Services US 31 in Johnson County - 1800082 - Indiana Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$42,044,000 CJ est. value
Franklin, IN 46131

Center Grove Middle School Central - Addition and Renovation - Bid Package 3,6,7,8,9,10
Addition, Demolition, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Greenwood, IN 46143

Center Grove HS Phase 2
Renovation, Addition
Post-Bid
Greenwood, IN 46143

Indiana Creek HS Football Field Artificial Turf Design-Build
New Construction
Results
Trafalgar, IN 46181

Franklin Animal Clinic Expansion
Addition, Demolition, Infrastructure
Pending Verification
$200,000 CJ est. value
Franklin, IN 46131

Johnson County Animal Shelter Addition
Addition, Demolition, Infrastructure
Bidding
$100,000 CJ est. value
Franklin, IN 46131

Education Service Center (ESC) Office Remodel
Renovation
Post-Bid
$70,000 est. value
Greenwood, IN 46143

Last Updated 08/31/2022 12:33 PM
Project Title

Center Grove Middle School North - Addition and Renovation

Physical Address View project details and contacts
City, State (County) Greenwood, IN 46142   (Johnson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $6,547,592 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Construction Manager for this project will be AECOM Hunt, 2450 South Tibbs Avenue, Indianapolis, IN 46241. All work for the complete construction of the Center Grove Middle School North will be bid under separate prime contract bids Bids shall be executed on State Form 96 and Supplementary Proposal Form included in the Project Manual. Bids shall be accompanied by AIA Document A305 Contractors Qualification statement Bids shall be accompanied by Contractors Financial Statement specific enough and in such detail so that the Owner can make a proper determination of the Bidders capability for completing the project if awarded. Should Bidder withdraw his bid within 60 days from bid opening date without written consent of the Owner or fail to execute a satisfactory contract with the Owner, the Owner may declare the bid security forfeited as liquidated damages. Commence Work within 48 hours after signing contract or receiving a notice to proceed, and complete work as outlined in Exhibit D in spec section 011000: Project Substantial Completion: October 27, 2023 Project Final Completion: December 29, 2023 A Bid security in the form of AIA Document A310, a certified check, Indiana General Revised Form No. 86, Contractors Combination Bid Bond and Bond for Construction or a form from an acceptable surety shall accompany each bid. The bid security shall be in the penal amount of 5% of the total bid price and made payable to the Owner.Prior to execution of the Contract, Bidder shall furnish Performance Bond and Payment Bond in the amount of 100% of the Contract Sum. Bonds shall remain in full force and effect for 12 months from date of acceptance of the work. Owner reserves the right to accept or reject any bid or waive any informality or error in bidding for a period of 60 days from bid opening date. Project No.: 22IN0021, 18035

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents