Similar Projects
Red Oak Creek Regional Wastewater System - Red Oak Creek Relief Interceptor, Segment 40RO-3
Infrastructure
Bidding
Less than $1,000,000 est. value
Red Oak, TX

Red Oak Creek Interceptor Segment 40RO-1 Phase 2
Infrastructure
Bidding
$10,000,000 est. value
Waxahachie, TX 75165

Water Meter Vault Construction
Post-Bid
TX

Gomez Water Improvements Project
Post-Bid
Waxahachie, TX

Prairie Ridge Phase 2B - Utilities
Results
TX

Prairie Ridge Phase 2B - Utilities
Results
TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

NR Internal Pipeline Cleaning and CCTV Inspection FY20
Term Contract
Results
Dallas, Denton, TX

2019 - 2020 Utility Projects Phase I
Results
Midlothian, TX 76065

14" Reclaimed Waterline Relocation
Results
Ennis, TX 75120

Lower Mustang Parallel Force Main #6B
Results
Less than $2,670,000 est. value
Waxahachie, TX 75165

Water Well Transmission Pipelines
Results
$150,723 est. value
Maypearl, TX 76064

Prairie Ridge Phase 2C - Utilities
Results
TX

2015 Water System Rehabilitation
Results
$1,807,000 est. value
Waxahachie, TX 75165

2019-2020 Utility Projects Phase II
Results
Midlothian, TX 76065

Last Updated 09/02/2021 08:08 AM
Project Title

Bluff Springs, Phase 1 - Utility Improvements

Physical Address View project details and contacts
City, State (County) Ferris, TX 75125   (Ellis County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope shall include the Utility Improvements, approximately 6,279 LF of 12” and 8” water, 10,517 LF of 10” and 8” sanitary sewer and 6” force main, lift station, and 4,072 LF of 33” through 18” RCP storm sewer, all per NCTCOG, Construction Plans, and City of Ferris specifications to serve 165 lots on approximately 36 acres. The project is located West and South of the intersection of F.M. 983 and Jimmie Birdwell Blvd. in City of Ferris ETJ, Ellis County, Texas.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents