Similar Projects
Last Updated | 12/02/2020 01:59 AM |
Project Title | Ponte Vedra Boulevard 6-inch Cast Iron Water Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Jacksonville Beach, FL (Duval County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of a new water main (WM) along Ponte Vedra Blvd between Corona Rd and Pablo Rd and along Solana Rd between Ponte Vedra Blvd and Rutile Dr. by open trench at the approximate lengths indicated: 7,860 LF of 12-inch PVC DR18, 80 LF of 10-inch PVC DR18, 100 LF of 8-inch PVC DR18, 280 LF of 6-inch PVC DR18 and 240 LF of 6-inch DIP (PC 350). JSEB Goal is 10% |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |