Similar Projects
RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

The Group IV Work
Infrastructure
Bidding
$1,926,000 CJ est. value
Kankakee, IL 60901

The Group IV Work
Infrastructure
Bidding
$1,926,000 CJ est. value
Kankakee, IL 60901

HMA Surface
Post-Bid
Manteno, IL

Street Maintenance-Milling and HMA Paving
Post-Bid
Kankakee, IL

8.426 Miles of 3R Resurfacing (Standard Overlay) and Structure Repairs
Results
IL

2021 MFT Street Maintenance Program
Results
Manteno, IL

2022 MFT Street Maintenance Program
Infrastructure
Bidding
$400,000 CJ est. value
Kankakee, IL 60901

Downtown Sidewalk Replacement
Post-Bid
Manteno, IL

Construct 20` Wide HMA Surface Course - Bourbonnais Road District
Results
$260,004 est. value
IL

Storm Sewer Slip-lining for River and Tetrault Streets
Infrastructure
Bidding
$93,000 CJ est. value
Bourbonnais, IL 60914

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Construct 20` Wide HMA Surface Course - Limestone Road District
Results
$388,749 est. value
IL

Asphalt Improvement
Post-Bid
Manteno, IL

3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd
Results

Last Updated 07/28/2022 12:32 PM
Project Title

2022 Bethel Drive Curb and Sidewalk Replacement Project

Physical Address View project details and contacts
City, State (County) Bourbonnais, IL 60914   (Kankakee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $197,113 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed Improvements: Sidewalk, Driveway, Curb & Gutter removal and replacement. Curb inlet frame and grate adjustment, and Pavement patching. Prevailing Wage Rates Apply All work including clean up shall be completed by August 12, 2022

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents