Similar Projects
New Science and Technology Center - Carl Sandburg College
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Galesburg, IL 61401

Construction of Water System Improvements - Phase II
Infrastructure
Bidding
$900,000 CJ est. value
Williamsfield, IL 61489

KCHA Cedar Creek Drainage
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Galesburg, IL 61401

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

North Kellogg Street Reconstruction
Results
Galesburg, IL 61401

South Kellogg Street Improvements
Infrastructure
Results
Galesburg, IL 61401

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

2022 Miscellaneous Sidewalk Replacement
Infrastructure
Construction
$290,749 CJ est. value
Galesburg, IL 61401

Bridge Preservation
Infrastructure
Bidding
$700,000 CJ est. value
Williamsfield, IL 61489

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Resurfacing, patching and ADA ramps on Henderson Road from the County Fairground entrance to Poplar Street in Knoxville
Infrastructure
Results
Knoxville, IL

Furnish and Apply
Infrastructure
Post-Bid
$500,000 CJ est. value
Knoxville, IL 61448

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Parking Lot Resurfacing
Infrastructure
Post-Bid
$200,000 CJ est. value
Knoxville, IL 61448

Last Updated 12/19/2022 04:31 PM
Project Title

Reconstruction of the Seminary and Mulberry Parking Lot

Physical Address View project details and contacts
City, State (County) Galesburg, IL 61401   (Knox County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction complete as of September 2022 , Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $186,647 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 19, 2022, construction has been completed, however, an exact timeline has not been confirmed. Reconstruction of the Seminary and Mulberry Parking Lot All bids shall be accompanied by a Bid Bond and Performance Bonds will be required for this project. The right is reserved to accept any bid or any part or parts thereof or to reject any and all bids. Vendors will be required to comply with all applicable EEO laws and regulations. The submission of the bid by the offeror in response to this Advertisement for Bids constitutes an acknowledgement of and an agreement by the Offeror that it understands and will comply with the Illinois Prevailing Wage Act and the Illinois Preference Act (30 ILCS 570). Resolution No. 90-74 requires compliance with the Human Relations Act and all pertinent federal and state rules and regulations. The contract award shall be made to the lowest responsible bidder whose bid properly addresses and complies with the invitation and is most advantageous to the City of Galesburg; price and other factors considered. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents