Similar Projects
Lassiter High School Theater Modifications
Renovation
Bidding
$8,000,000 CJ est. value
Marietta, GA 30066

Annual Concrete Pipe
Term Contract
Post-Bid
GA

Procurement of Canine Kennels Concrete Slabs
Alteration
Post-Bid
Less than $200,000 est. value
Covington, Hampton, Stockbridge, Temple, Villa Rica, GA 30180

Concrete Work at Gum Springs Park
Alteration
Results
GA

Ready-Mix Concrete Annual Contract
Term Contract
Results
GA

Canopy and Concrete Demolition and Replacement at Fire Station 51
Alteration
Post-Bid
Marietta, GA

Contract 2 - Water Plant Improvements and Concrete Rehabilation
Renovation, Alteration
Results
$650,000 est. value
Woodbury, GA

Landfill Scale Replacement
Infrastructure
Post-Bid
Rome, GA

North Transfer Station Loading Dock and Endwall Frame Modification
Alteration
Results
Chamblee, GA 30341

Purchase of Embedded Cylinder Pip
Alteration
Post-Bid
GA

Tactical Driving Course & Fire Training Ground - Clearing, Grading and Paving
Infrastructure
Results
$3,927,170 CJ est. value
Jonesboro, GA 30238

Pour Concrete Between Two Large Existing Concrete Slabs
Alteration
Post-Bid
GA

2022 Concrete Repair Project 2
Alteration
Results
Johns Creek, GA

Concrete for Facilities Management Division
Alteration
Post-Bid
Athens, GA

On-Call Contract Shotcrete and Restorative Services for the Stormwater Department
Term Contract
Results
GA

Last Updated 01/26/2023 05:41 PM
Project Title

Recreational Trail Improvements

Physical Address View project details and contacts
City, State (County) Albany, GA 31701   (Dougherty County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $509,168 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be bid on a unit price basis for all specified work and will be awarded to the lowest responsive and responsible bidder. 5% Bid Bond is required of all bidders. Bid bond must be present for bid to be read or considered. 100% Performance and Payment bonds will be required of the successful bidder. For additional information, contact Ricky Gladney, Buyer, at (229) 302-1455. Submit all questions via email to rqladney@albanyga.gov cc: jswilliams@albanyqa.gov. The deadline for guestions is November 3, 2022, at 2:30 PM. Questions received after this deadline may not be answered. Replies of substance will be in the form of written addenda and made available to all potential bidders. The scope of the work includes sawcutting and removal of broken and cracked concrete, replacement of these broken and cracked portions of the existing trail with new concrete, installation of decorative pavers in areas where they have been removed by past repairs, installation of a new ADA compliant handrail along the trail's southern end, driveway installation at Flint Avenue, and assorted other minor repairs.The work is in three locations: Monroe Street trailhead at the north end of the Connector Trail, traffic control measures in Tift Park, and repair and cleaning of the River Spur Trail at the south end of the Connector Trail. The construction of a concrete trailhead on Monroe Street is to be installed within City street right-of-way and on City owned property; the project consists of installation of a concrete parking spaces on Monroe Street and a concrete plaza area for pedestrians and cyclists using the existing Connector Trail and the future Rail-to-Trail along with associated work. The installation of timber guard rails and of bollards will be within Tift Park to control and limit vehicle access to the existing Connector Trail. The River Trail Spur extends from the southern end of the Connector Trail at Roosevelt Street southward to connect to the Riverfront Trail in the park located between the Flint River and Front Street. The existing spur trail will be cleaned, broken portions will be replaced, decorative pavers installed, and other improvements constructed. This is a unit cost contract, and the City reserves the right to adjust the quantities within the contract by increase, decrease, or elimination in order to bring the project within the funding budget.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents