Similar Projects
Oxford Drive Water Main and Drainage Improvements
Post-Bid
Bradenton, FL 34205

Riverview Boulevard Water Main Improvements
Infrastructure
Post-Bid
Bradenton, FL 34204

Sitework and Utility Installation
Results
Sarasota, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Palmetto Point Water Main Replacement
Results
Palmetto, FL 34221

Flamingo Cay Water Main Replacement
Results
$1,596,072 est. value
Bradenton, FL 34205

Rubonia Water Quality Improvement Project
Results
Palmetto, FL

69th Avenue Water Main Loop
Results
$2,817,000 est. value
Bradenton, FL 34205

Water Meter Testing
Term Contract
Results
Bradenton, FL 34205

Paradise Bay Watermain Replacement
Results
FL

Fire Hydrant Maintenance, Repair and Replacement Services
Term Contract
Results
Longboat Key, FL

Fogarty Subdivision Water Main Replacement
Results
FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Cortez Gardens Subdivision Water Main Replacement
Results
FL

Erie Road - US 301 to US 301 South-North Phase II
Results
FL

Last Updated 10/20/2021 03:16 AM
Project Title

Force Main 33A and 36A Replacements

Physical Address View project details and contacts
City, State (County) Bradenton, FL   (Manatee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of replace 1,438 linear feet of eight-inch force main (FM) and 2,829 linear feet of 14-inch force main (FM 33A & 36A RTU #238 & #241). Force main terminates in manhole at 3633 26th Street West and at 34A on 24th Street West. This is the lift station serving the south and east ends of The Bayshore on The Lakes Condominiums and a number of apartments that are over-loaded. The storage capacity is only one third of the total required and the existing 6- inch CIP force main has an approximate peak velocity of just under 10 fps. This lift station ties into the 14-inch CIP force main that has also been identified as requiring replacement

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents