Similar Projects
Intersection Improvements - CSAH 13 - CP 0013-369675
Infrastructure
Conception
$2,200,000 est. value
Muskogee, OK 74401

Utilities - US 62
Infrastructure
Conception
$1,000,000 CJ est. value
Muskogee, OK 74401

Utilities - US 62
Infrastructure
Design
$250,000 CJ est. value
Muskogee, OK 74401

Widen and Resurface - US 64
Infrastructure
Design
$3,600,000 CJ est. value
Muskogee, OK 74403

Campus-wide Parking Lot Repairs
Infrastructure
Bidding
$45,000 CJ est. value
Warner, OK 74469

Campus-wide Parking Lot Repairs
Infrastructure
Bidding
$45,000 CJ est. value
Warner, OK 74469

Webbers Falls Public Schools - 2023 Bond Project
New Construction, Infrastructure - 2,960 SF
Sub-Bidding
$2,000,000 CJ est. value
Webbers Falls, OK 74470

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Muskogee Port Access Road Extension
Infrastructure
Post-Bid
$340,000 est. value
OK

Replace & Upgrade Parking Lots 1 and 2
Term Contract
Results
$500,000 to $1,000,000 est. value
Muskogee, OK 74401

Water Line Leak Repair, Fire Hydrant Replacement and Street Cut Repair
Infrastructure
Results
$1,120,000 est. value
Muskogee, OK

St. Francis - Enabling Construction Projects
Renovation, Infrastructure - 8,220 SF
Construction
$1,515,000 CJ est. value
Muskogee, OK 74401

2019 Bond - Early Childhood Center - Muskogee Public Schools
New Construction, Infrastructure, Renovation
Pending Verification
$6,000,000 CJ est. value
Muskogee, OK 74401

2019 Bond - Early Childhood Center - Muskogee Public Schools
New Construction, Infrastructure, Renovation
Pending Verification
$6,000,000 CJ est. value
Muskogee, OK 74401

Right of Way - SH080
Infrastructure
Conception
$1,000,000 CJ est. value
Fort Gibson, OK 74434

Last Updated 09/18/2023 09:13 AM
Project Title

Industrial Access Road Extension Smith Ferry Road and South 24th Street John T. Griffin Industrial Park

Physical Address View project details and contacts
City, State (County) Fort Gibson, OK 74434   (Muskogee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $4,168,895 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of grading, drainage and surfacing of portions of Smith Ferry Road and South 24th Street with 8" Dowel Jointed P.C. Concrete Pavement totaling 5,640 LF. Also included are 3 RCBs at various creek crossings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents