Similar Projects
Water Tank Recoating 2019
Post-Bid
Less than $150,000 est. value
Jacksonville, OH

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

0.5 MG Elevated Water Storage Tank
Results
$1,590,000 est. value
Tipp City, OH

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Contract I: Procurement of two hundred (200) Grinder Pump Cores, Controls and Appurtenances
Results
Hillsboro, OH 45133

H--Annual Water Tank Cleaning and Inspection | Base +4 OYs
Results
Chillicothe, OH

Supply and Installation of a 12,000 Gallon Horizontal, Doublewall Tank
Results
Circleville, OH 43113

Dogwood Reservoir Rehabilitation
Results
Less than $388,198 est. value
Dayton, OH 45390

Bowling Green WPC ATAD Tank Cover Replacement
Results
Less than $750,000 est. value
Bowling Green, OH 43402

Brooks Avenue Elevated Water Tank Improvements
Term Contract
Results
Less than $380,000 est. value
Van Wert, OH 45891

WRRF Sludge Tank
Results
Less than $1,800,000 est. value
Wooster, OH 44691

Compost - DEF Tank
Results
Columbus, OH

West Elkton Water Tower Replacement
Results
New Miami, OH 45011

Easterly Aeration Tanks Rehabilitation Project(Atr-4)(1540)
Results
Less than $12,600,000 est. value
Cleveland, OH 44115

Luckey Area Water Tower Aeration and Mixing Improvements Wl 183L (A)(1)
Results
Less than $100,000 est. value
Bowling Green, OH 43402

Reported 05/28/2020 12:00 AM
Project Title

Repair Culvert Valve Bulkhead

Physical Address View project details and contacts
City, State (County) Newport, OH 45768   (Shelby County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will provide all labor, material and equipment necessary for loading four (4) Culvert Valve Bulkheads, transporting them to offsite facility, rehabilitating them, and then transporting them back to Willow Locks and Dam. Each Culvert Valve Bulkhead weighs approximately 15,000 lbs.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents