Similar Projects
Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Mechanical Systems Service
Post-Bid
Beaver Creek, OH

Replace Fan Coil Units Building 7 Sinclair Community College
Results
$200,000 est. value
Dayton, OH

Campus Steam System Repairs 2021
Results
$240,000 est. value
Athens, OH 45701

Beacon Schools Heating Boiler Replacement
Alteration
Post-Bid
$235,000 est. value
Athens, OH 45701

FCBDD 2021 ECLC Boilers Replacement
Results
$120,000 est. value
Columbus, OH 43214

Boiler Removal and Replacement for Northwest Elementary School, Northwest Middle School and Northwest High School
Alteration
Post-Bid
McDermott, OH 45652

DOW OPS - 2.5 Gallon Electric Water Heaters
Results
Columbus, OH

Weatherization and Energy Efficiency Programs
Alteration
Post-Bid
Ravenna, Warren, OH

Partial Roof Replacement, 3 rooftop HVAC units and 4 Boiler Replacements
Results
Less than $469,257 est. value
Toledo, OH

Culvert Valve Seals for Meldalh Locks & Dam
Term Contract
Post-Bid
Felicity, OH 45120

Parma #2 Boiler Replacement Boiler Replacement
Results
Cleveland, OH

Mechanical Contractors and Electrical Contractors - Upgrades to Mechanical Systems
Alteration
Post-Bid
Warren, OH 44483

Last Updated 07/11/2022 07:30 AM
Project Title

Chiller Replacement 2022 One Maritime Plaza

Physical Address View project details and contacts
City, State (County) Toledo, OH 43604   (Lucas County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $321,860 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project "Chiller Replacement 2022" at One Maritime Plaza consists of: Removal of existing water-cooled chiller along with associated piping, power feeder & conduits. Power feeder to be removed from chiller control panel. Temporary removal of ductwork and louvers to facilitate demo and installation. Removal of abandoned air-cooled condensing unit along with associated ductwork, piping, power feeder, and controls. Power feeder to be removed from the motor control center. Installation of new chiller, piping, power feeder, disconnect, conduit, and fuses as indicated on the drawings. Reinstall ductwork and louver.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents