Reported 05/27/2021 12:00 AM
Project Title

Public Works Facility Fence

Physical Address View project details and contacts
City, State (County) Fargo, ND 58102   (Cass County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Removal of approximately 389 feet of existing fence and 1-30 foot double sliding gate. 2. Design and specifications of new fence. 3. Installation of approximately 631’ of new fence, 2-30 foot double sliding gates, and 1-40 foot double swing gate. 4. The existing fence for removal consists of approximately 389 feet of fence and 1-30 foot double sliding gate. See attached “Map A” for location of removals. 5. The existing fence will be removed from the property and disposed of properly. Posts and any underground concrete associated will also be removed. 6. The vendor will be responsible for all aspects of the demolition to include; obtain utility locates, removal and disposal of the material, restoration of the site, restoration of any damages performed. 7. The vendor will create a design and specification that meet the needs of the City of Fargo. See attached “Map B” for new fence and gate locations. 8. The design will meet the minimum criteria listed in Section II, C. DESIGN. 9. The new fence will consist of approximately 631 feet of fence, 2-30 foot double sliding gates, and 1-40 foot double swing gate. See “Map B” for locations. 10. The vendor will be responsible for all aspects of the construction to include; obtain utility locates, manage impacts to pedestrian and vehicle traffic, secure the construction site as needed, and obtain any applicable permits and inspections. 11. Verify all measurements, specifications, and material needs prior to ordering material.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents