Similar Projects
Canterbury Furnaces
Alteration
Bidding
Salt Lake City, UT

DFCM Construction-Snow College Sevier Valley Center Chillers Replacement
Alteration
Bidding
$1,000,000 est. value
Richfield, UT 84701

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Kanab Center Foundation Venting
Post-Bid
Kanab, UT 84741

HEB Southeast Tower Fume Hood Upgrade
Results
$1,521,698 est. value
Salt Lake City, UT 84112

HVAC Preventative Maintenance and Repair Services
Results
Salt Lake City, UT 84111

DFCM Construction-Pre Qualified Mechanical-Udot Rampton MTF Building AHU and Unit Heaters
Alteration
Bidding
$771,000 est. value
West Valley City, UT 84119

Fire Station Hot Water System Re-Pipe
Post-Bid
Riverton, UT 84065

South Valley Services - HVAC Remodel/Construction
Results
West Jordan, UT 84088

ATC Upgrades for Cedar Ridge, Deerfield, and Mount Mahogany Elementary Schools
Alteration
Bidding
Alpine, Cedar Hills, Pleasant Grove, UT 84062

Weatherization Assistance Program
Post-Bid
Orem, UT 84097

HVAC Modifications
Results
Monticello, UT 84535

Dino-Housing HVAC Installation
Term Contract
Bidding
Yampa, CO - Green River, UT

Department of Labor - Combustible Dust Chambers
Post-Bid
Sandy, UT

Fashion Square Condenser Pump Replacement
Results
Less than $180,000 est. value
Murray, UT 84107

Last Updated 12/10/2021 07:23 AM
Project Title

DFCM Construction-DPS Farmington Public Safety Building HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Farmington, UT 84025   (Davis County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,743
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall include the following: Expand the existing Jace at the RTU to accommodate the additional points, replace 11 VAV boxes and associated controls, replace the controls for the existing boiler and heating water pumps, and re-balance building. Re-pipe the boiler room due to age and condition of existing piping shall also be included. New controllers shall be the Honeywell brand open license N4 classic Spyder

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents