Similar Projects
2022 North 7th Avenue Water Renovations
Infrastructure
Bidding
$427,000 est. value
Bozeman, MT 59715

Phase 5 Water System Improvements
Infrastructure
Bidding
$2,100,000 est. value
Harlowton, MT

VRF Piping Replacement
Infrastructure
Post-Bid
Helena, MT 59601

Phase 6 Water System Improvements
Infrastructure
Post-Bid
Roundup, MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Water System Improvements
Infrastructure
Results
Billings, MT 59105

Raw Water Intake, Pump Station, and Pipeline
Renovation, Infrastructure
Bidding
$50,000 est. value
Fort Smith, MT

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

Cooper Street Alley Water Main Replacement Project
Infrastructure
Results
Missoula, MT

Knight Livestock Pipeline Extension
Infrastructure
Bidding
$25,000 to $250,000 est. value
Wibaux, MT

Lead Service Replacements
New Construction, Demolition
Post-Bid
Billings, MT

New Water and Sewer Main, Street Reconstruction
Infrastructure
Results
$619,326 est. value
East Helena, Helena, MT 59601

Old Hardin Road Sidewalk: Phase II
Infrastructure
Bidding
$130,000 est. value
Lockwood, MT 59101

Spokane Avenue Water Main Replacement Project
Infrastructure
Post-Bid
Whitefish, MT 59937

Stoddard or Cooley Water Main Replacement Project
Infrastructure
Results
Missoula, MT 59802

Last Updated 07/05/2022 10:46 PM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Richey, MT   (Dawson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $390,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of 4 schedules. The first schedule includes approximately 3,200 feet of 8", 6" and 4" PVC water main that replaces 8", 6" and 4" AC. Schedule 2 includes approximately 1,700 feet of 8" and 6" PVC water main that replaces 6" AC. Schedule 3 includes approximately 1,025 feet of 8" PVC water main that replaces 4" AC. Schedule 4 includes approximately 1,050 feet of 8" and 4" PVC water main that replaces 4" AC. All 4 schedules include new gate valves, fittings, services and fire hydrants.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents