Similar Projects
Del Webb Server Room
New Construction
Conception
Salem, OR 97301

Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

AutoZone #2227 / Salem
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Salem, OR 97317

Region 2 (Central and South) Curve Warning Upgrades
Infrastructure
Design
$1,692,760 CJ est. value
Silverton, OR 97381

2022 Downtown Salem Streetscape Project
Infrastructure
Bidding
$1,443,953 CJ est. value
Salem, OR 97301

The Maples Rest Area Expansion and Improvements
Addition, Demolition, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Salem, OR 97301

Capitol Accessibility Maintenance and Safety (CAMS) Phase III - Bid Package #4 - Steel, Fire Suppression, Mech/Plumbing and Electrical
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Salem, OR 97301

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

USPS IQ JOC Oregon
New Construction, Renovation
Results
Less than $10,000,000 est. value

Health & Human Services Building
New Construction - 30,000 SF
Results
Salem, OR 97301

Anthony's Corner Apartments
New Construction, Build-out, Renovation, Infrastructure - 15,000 SF
Pending Verification
$31,000,000 CJ est. value
Salem, OR 97306

Water Street Mixed Use
New Construction, Infrastructure
Pending Verification
$2,700,000 CJ est. value
Silverton, OR 97381

West Salem Wastewater Pump Station Improvements - 0001063 - City of Salem
Renovation, Infrastructure
Conception
$22,510,140 CJ est. value
Salem, OR 97301

I-5: Kuebler Blvd to Delaney Rd Widening
Infrastructure
Design
$39,628,000 CJ est. value
Salem, OR 97317

Last Updated 10/25/2022 03:06 PM
Project Title

CAMS(Capitol Accessibility Maintenance and Safety) Phase III BP #3 - Demo, Concrete and Excavation

Physical Address View project details and contacts
City, State (County) Salem, OR 97301   (Marion County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Hoffman Construction Company, Construction Manager/general Contractor for Capitol Accessibility Maintenance & Safety Cams Phase Iii Being Performed for State of Oregon Office of the Legislative Administrator Requests Sub-bid Proposals for Bid Package #3 - Demo, Concrete Excavation. This project is subject to a Project Labor Agreement. A copy of a fully executed Project Labor Agreement (PLA) has been included with the Request for Proposals (RFP). A completed Subcontractor/Vendor Questionnaire including latest year-end safety and financial information must accompany the proposal unless previously submitted. Questionnaire may be attached as a separate file or submitted separately. Elaborate proposals or the inclusion of non-essential information e.g. marketing/promotional material, safety manuals, resumes, etc. is strongly discouraged. Proposals that are materially incomplete, do not include current Questionnaire with latest year-end safety and financial information (unless previously submitted), are directed to other locations or received after the bid deadline will not be considered. Bidders must be properly licensed with the Oregon Construction Contractors Board ("CCB") at the time of bid. Bidders are required to file a $30,000 Public Works Bond with the CCB in accordance with ORS 279C.836 EXCEPT exemptions allowed under paragraphs (7) or (8) will not be permitted. Due to the scheduled start of the work, the $30,000 Public Works Bond must be on file with the CCB at the time of bid. This is a prevailing wage project. Bidders must comply with requirements of the prevailing wage law in ORS Chapter 279C. A Contractor Controlled Insurance Program ("CCIP") for on-site operations is being provided for general liability and workers compensation with the exception of Bid Item #2 - Demolition. The demolition bidder will need to provide insurance per the RFP. Owner and Contractor are committed to promoting and stimulating the growth of disadvantaged business enterprises, minority owned, women owned, emerging small business, and service-disabled veterans business enterprises (D/M/W/ESB/SDV) firms and maximizing the opportunities for state of Oregon certified M/W/ESB/SDV firms to participate in the work of this project. Contractor is an equal opportunity employer and request bids from all qualified firms including disadvantaged, minority, women, disabled veterans and emerging small business enterprises. CCB License # 28417

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents