Similar Projects
US 12/Snake River Clarkston Bridge - Bridge Painting
Renovation, Infrastructure
Design
$15,660,000 CJ est. value
Clarkston, WA 99403

Cougar Creek Fish Passage Project
Infrastructure
Bidding
$550,000 CJ est. value
Anatone, WA 99401

2nd Street Overlay
Infrastructure
Post-Bid
Clarkston, WA 30021

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

WWTP Utility Water Building Improvements
New Construction, Alteration
Results
$250,000 to $300,000 est. value
Clarkston, WA 99403

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Landfill Future Entrance and Support Facilities Early Earthwork
Infrastructure
Results
Clarkston, WA 99403

2022 Street Maintenance Project
Infrastructure
Post-Bid
$350,000 est. value
Clarkston, WA

Libby Street Waterline Replacement
Term Contract
Results
$625,000 est. value
Clarkston, WA 99403

RFQ Construction Manager - General Contractor/construction Manager (Gc/cm) Asotin County Justice Complex
New Construction, Infrastructure - 53,000 SF
Post-Bid
$11,400,000 CJ est. value
Clarkston, WA 99403

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

expired Remington Reservoir and Booster Station Expansion
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Clarkston, WA 99403

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

RFP Construction Manager - Construction Management, Technical Support Project & Fiber Mapping for Dark Fiber Ftth
Infrastructure
Post-Bid
$800,000 CJ est. value
Clarkston, WA 99403

Last Updated 12/22/2022 02:04 AM
Project Title

Asotin County Regional Urban Stormwater Retrofit

Physical Address View project details and contacts
City, State (County) Clarkston, WA 99403   (Asotin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $430,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Construction of street storm drain systems in identified areas (including catch basins, storm piping, drywells, infiltration swales, and seepage trenches), asphalt repair and other improvements as specified. Bids must be completed on a lump sum and unit price basis as indicated on the BID PROPOSAL, and the total as defined in the Special Provisions will be used for the purpose of comparison of bids for the Urban Retrofit Project. Award of the construction contract will be to the lowest responsible bidder. All bids must be signed and accompanied by evidence of authority to sign. Bids must be accompanied by Bid Security in the form of a bid bond, certified check, cashiers check or cash in the amount of 5% of the amount of the bid proposal. Said bid security shall be forfeited to Owner as liquidated damages should the successful bidder fail to enter into contract in accordance with their proposal as specified in the Instructions to Bidders. Site Directions: 10 locations in Asotin County from Poplar St to Libby St (North/South) and 13th St to 16th St (East-West) 219054 Request for Clarification: Prospective Bidders shall make all requests for clarifications related to the project to the County in writing no later than December 8th, 2022. No verbal clarifications will be made.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents