Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

Scour Mitigation for Two Twin Structures
Infrastructure
Bidding
$5,000,000 CJ est. value
Aurora, CO 80019

Chambers Road Over Sand Creek Bridge Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Aurora, CO 80011

Riser Rings
Term Contract
Post-Bid
CO

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

On-Site Improvements
Results
Greenwood Village, CO 80111

On Call Construction Services - Urgent Water Pipeline Repair
Results
Englewood, CO

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

Centennial Medical Plaza
New Construction, Renovation, Infrastructure - 61,000 SF
Pending Verification
$7,000,000 CJ est. value
Centennial, CO 80112

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

McArthur Ditch Water Diversion
Infrastructure
Bidding
$622,897 CJ est. value
Aurora, CO 80011

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

2021 Alley Grading and Stabilization
Results
$350,000 to $400,000 est. value
Englewood, CO

Last Updated 08/15/2022 02:09 PM
Project Title

First Creek Interceptor Segments 1B, 1C, 1D Bid Package 1

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $20,570,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project No. 19095 CCD Accela No. 2021-CIP-0000149 No. 2022-CIP-0000003 CCD Project Master No. 2021-PROJMSTR-0000036 The First Creek Interceptor, Segments 1B, 1C, and 1D (FCI 1BCD) project, system comprises approximately 21,300 linear feet of 42-inch, 2,000 linear feet of 12-inch, and 160 linear feet of 36-inch diameter gravity interceptors. The project also includes five trenchless crossings of creeks and arterial streets. The interceptor depth ranges from 12 feet to depths up to 40 feet and will traverse multiple municipal jurisdictions including the City and County of Denver. The FCI 1BCD project was split into two bid packages due to the size and complexity of the project. The current project, Bid Package 1, includes the portion of the interceptor in Argonne St from 56th Ave north to High Point Blvd and the trenchless crossing of Picadilly Rd. Question Acceptance Deadline 06/28/2022 04:00 PM EDT Questions are submitted online No Piggyback Contract No

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents