Similar Projects
Improvements to the Cal Black Memorial Airport
Post-Bid
Halls Crossing, UT

SLC Airport Taxiway G Centerline PCC Panel Replacement
Post-Bid
Salt Lake City, UT

Rehabilitate (Reconstruct) North Apron
Results
Less than $289,422 est. value
Ogden, UT 84401

Wayne Wonderland Airport Runway 13/31 Reconstruction
Results
Less than $2,300,000 est. value
Loa, UT 84747

Flight Test Apron Hill Air Force Base
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Hill AFB, UT 84056

Salt Lake City Airport Taxiway E Reconstruction
Results
Salt Lake City, UT 84122

West 388Th/419Th Fighter Wing Apron at Hill AFB
Term Contract
Post-Bid
$25,000,000 to $100,000,000 est. value
Hill AFB, UT

Improvements to the Beaver Municipal Airport
Results
Less than $128,250 est. value
Beaver, UT 84713

Salina Gunnison Airport Runway Reconstruction
Infrastructure
Post-Bid
Gunnison, UT

Improvements to Spanish Fork Airport Construct Taxiway B1
Results
$500,000 est. value
Spanish Fork, UT 84660

Skypark Airport
Results
Less than $1,000,000 est. value
Centerville, UT

Improvements to Milford Municipal Airport / Ben and Judy Briscoe Field Reconstruct Runway 16/34
Results
$2,100,000 est. value
Milford, UT 84751

Improvements to Cedar City Regional Airport
Results
Less than $60,000 est. value
Cedar City, UT 84720

FY20 Apron Pavement Maintenance
Results
Less than $59,250 est. value
Hurricane, UT 84737

Improvements to Spanish Fork Airport Rehabilitate Runway 12/30
Results
Less than $200,000 est. value
Spanish Fork, UT 84660

Last Updated 07/23/2021 09:55 AM
Project Title

Improvements to the Manti-Ephraim Airport

Physical Address View project details and contacts
City, State (County) Ephraim, UT 84627   (Sanpete County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $406,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involved will include the following: Schedule I - Construct Runway 3 Taxiway Turnaround The major items involved in the proposed work are: excavation, subgrade preparation, subbase course, base course, asphalt, pavement markings, storm drain pipe, underdrain, catch basin, and airfield lighting. Construction for this project is expected to take 20 Working Day(s).

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents