Similar Projects
Berwick Area YMCA
New Construction - 8,000 SF
Conception
$3,300,000 est. value
Berwick, PA 18603

Lancaster Host Resort - Expo Center Parking
New Construction
Design
Lancaster, PA 17602

Hopewell Township Park Walking Trail and Old Firehouse Parking Lots
Post-Bid
Newburg, PA 17240

Tree Maintenance/Removal 2
Term Contract
Post-Bid
Pittsburgh, PA 15219

Parking Lot Construction for Administration Building
Results
Latrobe, PA

Woodcock Creek Lake/Union City Dam Buildings & Grounds Maintenance Contract
Results
Saegertown, Waterford, PA 164330629

Eagle Village Parking Expansion
Addition
Construction
$100,000 est. value
Chester Springs, PA 19425

AMPAC Site and Streetscape Improvements
Renovation
Construction
$719,800 est. value
Pittsburgh, PA 15204

Specialized Tree Pruning and Removal Services Plus Line Clearing Project
Post-Bid
Reading, PA

CDBG Curb Cut Reconstruction Project - 2018 Pine Street (Parts I and II) and Chestnut Street (Parts III and IV)
Results
Berwick, PA

Greentree Industrial Park - Truck Parking
New Construction
Construction
Alburtis, PA 18011

Scott Park ADA Ramps and Sidewalk Improvements
Post-Bid
$38,390 est. value
Carnegie, PA 15106

Logan Avenue Streetscape
Results
Tyrone, PA 16686

Handicapped Parking and Infield Access Tunnel
Construction
Port Royal, PA 17082

Weed and Vegetation Control Services for City Owned Parks, Playgrounds and Properties
Post-Bid
Reading, PA 19600

Reported 12/17/2019 12:00 AM
Project Title

Francis Avenue Tree Removal and Sidewalk Installation Project

Physical Address View project details and contacts
City, State (County) Connellsville, PA 15425   (Fayette County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping/Irrigation, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: removing existing trees/stumps and installing new sidewalks (replace existing were applicable) along both sides of East Francis Avenue from McCormick Avenue to the Connellsville City – Connellsville Township border.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents