Similar Projects
UC Boulder Masterplan
New Construction, Renovation
Conception
Boulder, CO 80309

Standing Order Contractor Program
Bidding
Less than $50,000 est. value
Boulder, CO 80303

Notice #19-25-Pr010107/Hsg11132-Aden & Brkt-Maint
Renovation
Post-Bid
$750,000 est. value
Boulder, CO 80303

Notice #19-27-Cp272988-Seel Rm 185C Cosinc Chr Lab Renovatio
Renovation
Post-Bid
Less than $600,000 est. value
Boulder, CO 80303

Cu Boulder Mse/Rasei Suite Renovation
Renovation - 8,425 SF
Results
Less than $1,000,000 est. value
Boulder, CO 80303

SEEL-RM 356A-COSINC-FAB Construction Management / General Contracting Services
Results
$3,500,000 est. value
CO

Notice 19-26-SLL(NPL)-FS-SwtchGr-Lab Reno Projects
Renovation
Construction
$1,500,000 est. value
Boulder, CO 80309

ECCE Room 100 - Bold Center Remodel
Renovation
Construction
Less than $680,000 est. value
Boulder, CO 80309

Case- Accomodated Testing Center
Build-Out
Post-Bid
Boulder, CO

Notice 20-05-Cp282088-Muen-E412-18 Reno & Cp292026-Muen-D044
Renovation
Results
Less than $750,000 est. value
Boulder, CO 80309

UMC - Remodel Reception Desk and Room 235
Renovation
Post-Bid
$580,000 est. value
Boulder, CO

CU Boulder - Farrand Hall Maintenance
Results
Less than $1,638,000 est. value
Boulder, CO 80309

Building Renovations & Deck Replace, Deplex Deck Replacement
Post-Bid
$1,035,000 est. value
Boulder, CO

1135BRD - 1135 Broadway Renovations
Renovation - 14,740 SF
Post-Bid
Less than $3,600,000 est. value
Boulder, CO 80309

Ucb000270-Stne-Kitchen Maintenance-2021-Rfp-Dbb
Post-Bid
Less than $544,000 est. value

Reported 02/28/2020 12:00 AM
Project Title

Notice #19-32-Pr01026/Hsg11122-C4c-Ofc Suite Renovations

Physical Address View project details and contacts
City, State (County) Boulder, CO   (Boulder County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $650,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include paint, carpet, wall reconfiguration, mechanical work, electrical, Fire alarm, DDC controls, and lighting. May include some FF&E. Reconfiguration of several office areas. Painting and new carpet in various locations within the designated suites. Miscellaneous electrical, plumbing, fire sprinkler, fire alarm systems, DDC controls, lighting controls, low voltage data, and mechanical work. Physical Construction start date is May 11, 2020 with Final Completion of July 31, 2020

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents