Similar Projects
Water, Sewer, Storm and Street Improvement - Lost River 7th Addition
Infrastructure
Bidding
Horace, ND

Maple Lake Estates Addition - Phase II
Infrastructure
Bidding
$3,710,000 est. value
Horace, ND

New Paving and Utility Construction Improvement
Post-Bid
$1,341,041 est. value
Fargo, ND

2021 FM Diversion Pipeline Improvements Phase 1
Infrastructure
Post-Bid
Kindred, ND

South Regional Water Connection Phase 2
Results
$2,000,000 est. value
Fargo, ND

Sanitary Sewer, Water Main, Storm Sewer, Paving and Incidentals
Results
Less than $1,971,919 est. value
Fargo, ND 58102

Water Main Repair Materials/Fire Hydrant/Street Materials
Alteration
Post-Bid
Fargo, ND

Water Main Replacement, Street Reconstruction and Incidentals
Results
Less than $3,523,290 est. value
Fargo, ND 58102

19th Street S - Casselton
Infrastructure
Post-Bid
$280,000 est. value
Casselton, ND

Water Main Replacement, Storm Sewer, Street Reconstruction and Incidentals
Results
$3,523,290 est. value
Fargo, ND 58102

P.C. Concrete Alley Paving, Water Main and Incidentals
Results
Less than $163,673 est. value
Fargo, ND 58102

Paving and Utility Rehabilitation/Reconstruction Improvement
Results
$1,061,001 est. value
Fargo, ND 58102

Administration Avenue - Phase 4
Results
$423,070 est. value
Fargo, ND 58107

37th Street and 46th Avenue Utilities
Results
$1,940,912 est. value
Fargo, ND 58102

Southdale Farms Third Addition
Results
$7,800,000 est. value
Horace, ND

Last Updated 04/26/2022 12:13 AM
Project Title

2022 System Wide Distribution Improvements

Physical Address View project details and contacts
City, State (County) Kindred, ND   (Cass County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is comprised of one (1) Contract with one (1) Base Bid and eight (8) Bid Alternates: Contract No. 1 – Pipeline Construction. The Base Bid and Alternates have an ‘A’ Option - PVC Pipeline Construction and a ‘B’ Option - Poly Pipeline Construction. Contract No. 1 will award the Base Bid ‘A’ Option or Base Bid ‘B’ Option with or without any combination of the alternates; Alternates with an ‘A’ Option or a ‘B’ Option will only award the ‘A’ Option or the ‘B’ Option if the corresponding alternate is accepted for award. Contractor must bid the Base Bid and all alternates. The Contractor is allowed to bid either the ‘A’ Option or the ‘B’ Option, both the ‘A’ Option and the ‘B’ Option, or any combination of the ‘A’ Option and ‘B’ Option for the Base Bid and all alternates. The Work is generally described as follows: Contract No. 1: Pipeline Construction: 1. Base Bid – Option A or Option B: Construction of rural water pipelines consisting of furnishing and installing the following approximate quantities: 4,700 feet of 3-inch pipeline, 300 feet of 3-inch DR 11 IPS Poly directional bores, one (1) steel railroad cased bores with POLY carrier pipe; two (2) tie-ins to existing system, two (2) 3-inch gate valves and all associated fittings and appurtenances, restoration, flushing and testing, signage, seeding, and gravel. 2. Alternates No. 1 – No. 8 to Contract No. 1 – Option A or Option B: Construction of rural water pipelines consisting of furnishing and installing the following approximate quantities: 750 feet of 2-inch IPS pipeline, 14,650 feet of 3-inch IPS pipeline, 126,500 feet of 4-inch IPS pipeline, 150 feet of 2-inch DR 11 IPS Poly directional bores, 1,750 feet of 3-inch DR 11 IPS Poly directional bores, 7,450 feet of 4-inch DR 11 IPS Poly directional bores, two (2) steel railroad cased bores with Poly carrier pipe, twenty (20) tie-ins to existing system, thirty-seven (37) gate valves ranging in size from 1.5-inch to 6-inch, nine (9) 1-inch flush/air blow off valve, and all associated fittings and appurtenances, restoration, flushing and testing, signage, seeding, and gravel. Note Alternate No. 6 Option B upsizes the pipeline sizes from Option A 3-inch PVC to 4-inch Poly and Alternate No. 7 Option B upsizes the pipeline sizes from Option A 4-inch PVC to 6-inch Poly. The work for Contract No. 1 must be completed no later than the following: 1. Base Bid a. Substantial Completion – October 15, 2022 b. Final Completion – November 1, 2022 2. Alternates No. 1 through No. 8 to Contract No. 1 a. Substantial Completion – July 1, 2023 b. Final Completion – July 15, 2023

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents