Similar Projects
Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

Hot Mix Asphalt Cold Milling and Resurfacing
Infrastructure
Design
$97,507,120 CJ est. value
Warren, MI 48093

IDIQ MATOC for Design-Bid-Build Marine Construction within the USACE Lakes Districts (Buffalo, Chicago, Detroit) Mission Boundaries
Term Contract
Bidding
Buffalo, NY 14202

Rehabilitation of Pump Station 1 Improvements
Renovation, Infrastructure
Bidding
$63,402,000 CJ est. value
Detroit, MI 48209

Removal of Playscape Near Post Office
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Grosse Ile, MI 48138

Fencing and Gate (Trade Package32A) 3029 Seyburn
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Detroit, MI 48214

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Water Meter Installation
Term Contract
Post-Bid
Detroit, MI

2021 Water Main and Sewer Repair Contract
Results
Ecorse, MI

North Fishing Site Redevelopment
Results
Belleville, MI 48111

Mariam Outreach Center / Livonia
New Construction, Infrastructure - 25,000 SF
Pending Verification
$6,450,000 CJ est. value
Livonia, MI 48152

Anchor at Mariners Inn
Addition, Infrastructure, Renovation
Pending Verification
$31,684,000 CJ est. value
Detroit, MI 48201

Pipes, Valves, and Fittings
Term Contract
Design
Detroit, MI 48226

Restrooms Renovations At DPW, Courthouse And Police HQ
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Dearborn, MI 48126

Ductile Iron Pipe - Various Sixes
Term Contract
Sub-Bidding
Detroit, MI 48226

Last Updated 08/10/2022 09:38 AM
Project Title

2022-2024 DWRF Watermain Replacement Program

Physical Address View project details and contacts
City, State (County) Melvindale, MI 48122   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $7,242,233 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

uestion Acceptance Deadline 05/06/2022 04:00 PM EDT Questions are submitted online No The 2022-2024 DWRF Watermain Replacement Program consists of 4 Projects. Projects selected to be constructed will be selected after bids are opened. The Oakwood Boulevard and Coleman Street Projects are to be constructed in 2022. The Roberts Street Project is to be constructed in 2023. The Henry Street Project is to be constructed in 2024. These will be bid all as one package under one contract, with plans for each project and one overall spec book. Award will be made to the lowest Contract Total (total cost of all four projects). The proposed Oakwood Boulevard project consists of approximately 2,470 linear feet of 12" directional drill and 360 linear feet of 12" open cut to replace an existing 8" water main along Oakwood Boulevard, between Allen Road and Elizabeth Street, within the City of Melvindale. The anticipated start date, weather permitting, is no later than July 19, 2022 and substantially completed by October 14, 2022 with final completion by October 28, 2022. The proposed Coleman Street project consists of approximately 270 linear feet of 8" directional drill and 40 linear feet of 8" open cut water main along Coleman Street, between Ruth Street and Reed Street, within the City of Melvindale. The anticipated start date, weather permitting, is no later than July 19, 2022 and substantially completed by October 14, 2022 with final completion by October 28, 2022. The proposed Robert Street project consists of approximately 3,810 linear feet of 8" directional drill and 400 linear feet of open cut to replace an existing 6" water main along Robert Street, between Oakwood Boulevard and South Dearborn Street, within the City of Melvindale. The anticipated start date, weather permitting, is no later than April 15, 2023 and substantially completed by June 15, 2023 with final completion by June 30, 2023. The proposed Henry Street project consists of approximately 4,080 linear feet of 8" directional drill and 590 linear feet of 8" open cut to replace an existing 6" water main along Henry Street, between Oakwood Boulevard and South Dearborn Street, within the City of Melvindale. The anticipated start date, weather permitting, is no later than April 15, 2024 and substantially completed by June 15, 2024 with final completion by June 30, 2024. All Requests for Information (RFI) are due by May 6, 2022, by 4:00 pm (EST), using the link provided: https://forms.gle/9zHP6yBrMpHsj35k8 Responses to RFI's will be returned by May 11, 2022, by 4:00 pm (EST). The Contract Documents may be examined at the offices of: *City of Melvindale Department of Public Services *Hennessey Engineers, Inc., Southgate, Michigan *Construction Association of Michigan, Bloomfield Hills, Michigan *Constructions News Service, Oakbrook, Illinois *Construction News Corp, Cleveland, Ohio Bidders must deposit, with their bid, surety in the form of a certified check, bank draft, or bid bond, in the sum of five percent (5%) of the amount of the proposal. The OWNER reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 90 days after the date of bid opened.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents