Similar Projects
Heritage Lift Station Upgrade - City of Gillette
Infrastructure
Conception
$2,500,000 CJ est. value
Gillette, WY 82716

Foothills Boulevard Curves/Drainage - 47401 - City of Gillette
Infrastructure
Conception
$2,500,000 CJ est. value
Gillette, WY 82716

Gillette to Wright Wy 59
Infrastructure
Design
$6,139,000 CJ est. value
Gillette, WY 82718

Gillette to Wright Wy 59
Infrastructure
Design
$6,139,000 CJ est. value
Gillette, WY 82718

2023 Crack Sealing
Infrastructure
Sub-Bidding
$60,100 CJ est. value
Gillette, WY 82716

2023 Crack Sealing
Infrastructure
Sub-Bidding
$60,100 CJ est. value
Gillette, WY 82716

Road Maintenance
Infrastructure
Post-Bid
Gillette, WY

Annual Trenching and Boring Services
Term Contract
Post-Bid
Gillette, WY

Chip Sealing and Miscellaneous Work
Infrastructure
Results

District 4 Logo Signs
Infrastructure
Results
$200,000 est. value
Gillette, WY

U-Haul of Gillette
New Construction, Infrastructure - 38,264 SF
Pending Verification
$4,000,000 CJ est. value
Gillette, WY 82718

Powder River Basin Renewable Natural Gas Facility
New Construction, Infrastructure
Pending Verification
$7,500,000 CJ est. value
Gillette, WY 82716

Warlow Drive Street Improvements Project - 44331 - City of Gillette
Infrastructure
Conception
$2,250,000 CJ est. value
Gillette, WY 82716

RFP Design - Design Services For Campbell County Aquatic Center (CCSD) Aquatic Facility
Infrastructure
Post-Bid
$450,000 CJ est. value
Gillette, WY 82716

Kluver Road PRV Project
Infrastructure
Results
$300,000 est. value
Gillette, WY 82716

Last Updated 05/16/2023 05:34 AM
Project Title

Rehabilitate GA Apron for Northeast Wyoming Regional Airport

Physical Address View project details and contacts
City, State (County) Gillette, WY 82716   (Campbell County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Airport: Runways, Taxiways, Access Roads, Aprons The proposed work consists of AIP Project No. 3-56-0012-054-2023 / WYDOT Project No. AGC014A Rehabilitate GA Apron. The major elements of work include: Schedule 1 - Rehabilitate GA Apron - Concrete Schedule 2 - Install LED Light Fixtures

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents