Similar Projects
Centrifugal Pump
Infrastructure
Bidding
Boston, MA

Redevelopment of Furnace Brook Well No 2 and Replacement of Well Pumping Unit
Infrastructure
Bidding
$50,000 est. value
Marshfield, MA 02050

Cleaning, Redevelopment and Chemical Treatment of Gravel Packed Wells
Post-Bid
Less than $82,000 est. value
Walpole, MA

Well No. 3 Upgrades - General Bids
Post-Bid
Less than $750,000 est. value
Littleton, MA

Heather Row Grinder Pump (Furnish and Install)
Results
$225,000 est. value
Tewksbury, MA

GP 1 Replacement Well Implementation - General Bids
Results
$350,000 est. value
Seekonk, MA

Main Street Plaza Sewer Pump Station Panel Relocation
Infrastructure
Bidding
Wilmington, MA 01887

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

Decommissioning of a Former Water Well
Results
$15,000 to $25,000 est. value
Huntington, MA

Grindstone Well Reactivation
Infrastructure
Bidding
$280,000 est. value
Rochdale, MA

Dewatering Pump Restoration and Maintenance Service, Diesel Powered
Post-Bid
Charlestown, MA

Construction of Two Gravel-Packed Wells for Municipal Water Supply, and Decommissioning of Four Municipal Wells
Results
$475,000 est. value
South Dartmouth, MA 02748

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Well Rehabilitation and Pump Maintenance Services
Term Contract
Results
North Attleborough, MA

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

Last Updated 10/04/2021 12:09 PM
Project Title

Temporary PFAS Treatment Well No. 7

Physical Address View project details and contacts
City, State (County) Dudley, MA   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The work consists of constructing a temporary PFAS treatment system for Well No. 7 using an Municipal Agency furnished Granular Activated Carbon Vessel. Work includes raw water main and filtered water main, site grading, concrete pad, coordination of gas service relocation, security fencing, and electrical and associated site work

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents