Similar Projects
Davis Road Widening - WT26029 - City of Stockton
Infrastructure
Conception
$4,371,000 est. value
Stockton, CA 95214

California Street Gap Closure Improvements - WT26024 - City of Stockton
Infrastructure
Conception
$396,000 est. value
Stockton, CA 95214

On-Call Utility Repair Services
Infrastructure
Post-Bid
Stockton, CA

San Joaquin Pipeline Valve and Safe Entry Improvements - Phase 1B
Infrastructure
Post-Bid
$14,000,000 est. value
Stockton, CA

Bishop Tract,2021/2022 Pipe Crossing Rehabilitation Project
Infrastructure
Results
$570,615 est. value
Stockton, CA

Del Norte Street Sewer Rehabilation - UW25010 - City of Stockton
Infrastructure
Conception
$6,677,000 est. value
Stockton, CA 95203

Stormwater Drainage Basin Maintenance
Infrastructure
Post-Bid
Stockton, CA

Camanche Sanitary Pump Station Rehabilation - UW25002 - City of Stockton
Infrastructure, Alteration
Conception
$436,000 est. value
Stockton, CA

$MUNI - CIP - RWCF Modify Project - UW16022 - City of Stockton
Infrastructure
Conception
Stockton, CA

El Dorado Storm Drain Installation - US26002 - City of Stockton
Infrastructure
Conception
$275,175 est. value
Stockton, CA

West Lane and Calaveras South Sanitary Sewer - UW24001 - City of Stockton
Infrastructure
Conception
$674,000 est. value
Stockton, CA 95202

Hazelton Avenue Sewer Trunk Rehabilitation - UW24011 - City of Stockton
Infrastructure
Conception
Less than $1,612,000 est. value
Stockton, CA 95205

Alexandria and 14 Mile Storm Pump Station - US24001 - City of Stockton
Infrastructure
Conception
$384,000,000 est. value
Stockton, CA 95202

Sperry Rd/Gibraltar Ct Sanitary Sewer Rehab - UW23009 - City of Stockton
Infrastructure
Conception
$3,704,000 est. value
Stockton, CA

Reported 07/20/2022 11:42 AM
Project Title

Charter and Tillie Lewis Flood Relief - US26001 - City of Stockton

Physical Address View project details and contacts
City, State (County) Stockton, CA 95206   (San Joaquin County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026,
Bids Due View project details and contacts
Estimated Value Less than $255,687
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will bore and jack a 30-inch steel casing with a 24- inch storm drain carrier pipe under Charter Way at Tillie Lewis Drive. The purpose of this project is to convey drainage from north of Charter Way to 800 feet south of the site, and connect to the existing 30-inch storm drain in Tillie Lewis Drive. This project is in included in the City of Stockton FY 2023-2027 Capital Improvement Plan (CIP). As of March 24, 2022, further details regarding design and construction have not been identified.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents