Similar Projects
Cherry Valley & Linderman Elementary, Middle School & High School Improvement
Renovation
Conception
Polson, MT 59860

Cherry Valley & Linderman Elementary, Middle School & High School Improvement
Renovation
Conception
Polson, MT 59860

Replacement and Renovation Work at the Ronan Career Center Building
Demolition, New Construction, Renovation, Infrastructure
Bidding
$414,000 CJ est. value
Ronan, MT 59864

Replacement and Renovation Work at the Ronan Career Center Building
Demolition, New Construction, Renovation, Infrastructure
Bidding
$414,000 CJ est. value
Ronan, MT 59864

NLCPL Remodel North Lake County Public Library
Demolition, Renovation, Infrastructure - 10,233 SF
Sub-Bidding
$3,000,000 CJ est. value
Polson, MT 59860

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Overlay and Chip Seal Lodgepole Road Kalispell Area
Alteration
Post-Bid

Hudson Bay Divide South
Infrastructure
Results

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

North Reservoir Road - 3.5 Miles - Lake County
Infrastructure
Conception
$2,000,000 CJ est. value
Polson, MT 59860

Well House, Well 8 Project
Renovation, Infrastructure
Post-Bid
$400,000 CJ est. value
Polson, MT 59860

Scrub Seal Hwy 10 E Se of Greycliff Interchange Billings Area
Infrastructure
Results

Lower Moiese Valley Road - 1.3 Miles - Lake County
Infrastructure
Conception
$950,000 CJ est. value
Charlo, MT 59824

Multi-Purpose Building
New Construction - 3,360 SF
Post-Bid
$200,000 est. value
Polson, MT

Jackson Creek Road Improvements
Term Contract
Results

Last Updated 02/27/2023 10:52 AM
Project Title

New Elementary School - Arlee Public Schools

Physical Address View project details and contacts
City, State (County) Arlee, MT 59821   (Lake County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $14,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to create a new wing for grades 3-6 that connects to the current K-2 classrooms creating one cohesive elementary building. As of February 27, 2023, the design firm has been selected. This project is currently in design. The construction documents completion timeline has not been released. A tentative bid schedule for contractors has not been disclosed. Construction is slated to begin Spring 2024; however, the firm timeframe has not been identified.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents