Similar Projects
Sessom Drainage and Street Improvements
Infrastructure
Bidding
$6,531,373 est. value
San Marcos, TX 78666

Construction of Kissing Tree West Centerpoint Road Phase 3A
Infrastructure
Bidding
San Marcos, TX 78666

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Driftwood Phase 1 Section 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Southern Region Disaster Recovery Support BPA
Results

E Hopkins Pedestrian & Bike Improvements (Hopkins from CM Allen to Thorpe)
Results
Less than $1,750,000 est. value
San Marcos, TX 78666

Darden Hill at Sawyer Ranch Roundabout
Term Contract
Bidding
Driftwood, TX 78619

Old Fitzhugh Road Project
Post-Bid
$4,400,000 to $4,800,000 est. value
Dripping Springs, TX 78620

Road Improvements Remove and Replace Hot Mix
Results
Less than $1,761,155 est. value
San Marcos, TX 78666

FM 621 - Intersection and Operational Improvements
Infrastructure
Bidding
$1,536,394 est. value
TX

SH 130 - Cherryville Parkway / CR 110 Improvements
Post-Bid
$700,000 est. value
Buda, TX

Sunfield Phase 4 Section 3A Paving Improvements
Results
Buda, TX 78610

Plum Creek Section 10-1 - Water, Wastewater, Drainage, and Paving Facilities
Infrastructure
Bidding
TX

Kissing Tree West Centerpoint Road - Phase 2B
Infrastructure
Post-Bid
San Marcos, TX 78666

Repair, Level-Up and Seal Coat
Results
Less than $1,609,744 est. value
TX

Last Updated 01/08/2022 12:00 AM
Project Title

RM 150 - Hazard Elimination and Safety

Physical Address View project details and contacts
City, State (County) TX   (Hays County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,129,452
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 133.000 1 104 6017 Removing Conc (Driveways) Sy 121.000 2 110 6001 Excavation (Roadway) Cy 3,278.000 3 132 6003 Embankment (Final)(Ord Comp)(Ty b) Cy 11,159.000 4 160 6003 Furnishing And Placing Topsoil (4") Sy 63,258.000 5 162 6002 Block Sodding Sy 2,872.000 6 164 6035 Drill Seeding (Perm) (Rural) (Clay) Sy 63,258.000 7 164 6071 Broadcast Seed (Temp)(Warm Or Cool) Sy 63,258.000 8 168 6001 Vegetative Watering Mg 111.000 9 169 6002 Soil Retention Blankets (Cl 1) (Ty b) Sy 63,258.000 10 247 6366 Fl Bs (Cmp In Plc)(Ty a Gr 5)(Fnal Pos) Cy 3,531.000 11 310 6001 Prime Coat (Multi Option) Gal 3,174.000 12 347 6001 Tom (Asphalt) Pg 76-22 Ton 181.600 13 347 6006 Tom - c (Aggregate) Sac - b Ton 2,731.900 14 351 6001 Flexible Pavement Structure Repair(5") Sy 100.000 15 400 6006 Cut & Restoring Pav Sy 143.000 16 402 6001 Trench Excavation Protection Lf 234.000 17 403 6001 Temporary Spl Shoring Sf 1,424.000 18 420 6071 Cl c Conc (Collar) Ea 8.000 19 432 6003 Riprap (Conc)(6 In) Cy 6.000 20 432 6033 Riprap (Stone Protection)(18 In) Cy 47.000 21 432 6045 Riprap (Mow Strip)(4 In) Cy 95.000 22 462 6001 Conc Box Culv (3 Ft x 2 Ft) Lf 104.000 23 462 6109 Conc Box Culv (8 Ft x 3 Ft)(Extend) Lf 20.000 24 464 6003 Rc Pipe (Cl Iii)(18 In) Lf 132.000 25 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 204.000 26 464 6007 Rc Pipe (Cl Iii)(30 In) Lf 48.000 27 464 6008 Rc Pipe (Cl Iii)(36 In) Lf 148.000 28 464 6031 Rc Pipe (Arch)(Cl Iii)(Des 2) Lf 96.000 29 464 6032 Rc Pipe (Arch)(Cl Iii)(Des 3) Lf 321.000 30 466 6097 Headwall (Ch - Pw - 0) (Dia= 24 In) Ea 4.000 31 466 6099 Headwall (Ch - Pw - 0) (Dia= 30 In) Ea 2.000 32 466 6110 Headwall (Ch - Pw - a - 0) (Des= 3) Ea 2.000 33 466 6134 Headwall (Ch - Pw - s) (Dia= 36 In) Ea 2.000 34 466 6178 Wingwall (Pw - 1) (Hw=3 Ft) Ea 1.000 35 466 6180 Wingwall (Pw - 1) (Hw=5 Ft) Ea 2.000 36 467 6103 Set (Ty i)(s=3 Ft)(Hw=2ft)(6:1)(p) Ea 2.000 37 467 6363 Set (Ty Ii) (18 In) (Rcp) (6: 1) (p) Ea 8.000 38 467 6395 Set (Ty Ii) (24 In) (Rcp) (6: 1) (p) Ea 12.000 39 467 6423 Set (Ty Ii) (30 In) (Rcp) (6: 1) (p) Ea 2.000 40 467 6531 Set (Ty Ii) (Des 2) (Rcp) (6: 1) (p) Ea 6.000 41 467 6543 Set (Ty Ii) (Des 3) (Rcp) (4: 1) (p) Ea 3.000 42 467 6545 Set (Ty Ii) (Des 3) (Rcp) (6: 1) (p) Ea 10.000 43 496 6004 Remov Str (Set) Ea 38.000 44 496 6007 Remov Str (Pipe) Lf 639.000 45 496 6008 Remov Str (Box Culvert) Lf 88.000 46 496 6016 Remov Str (Pipe) Ea 4.000 47 500 6001 Mobilization Ls 1.000 48 502 6001 Barricades, Signs And Traffic Handling Mo 14.000 49 506 6004 Rock Filter Dams (Install) (Ty 4) Lf 755.000 50 506 6011 Rock Filter Dams (Remove) Lf 755.000 51 506 6038 Temp Sedmt Cont Fence (Install) Lf 726.000 52 506 6039 Temp Sedmt Cont Fence (Remove) Lf 726.000 53 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 1,852.000 54 506 6045 Biodeg Erosn Cont Logs (Instl) (6") Lf 1,852.000 55 508 6001 Constructing Detours Sy 343.000 56 530 6004 Driveways (Conc) Sy 119.000 57 530 6005 Driveways (Acp) Sy 3,012.000 58 540 6001 Mtl w-Beam Gd Fen (Tim Post) Lf 1,033.000 59 540 6020 Mtl w - Beam Gd Fen (Low Fill Culvert) Lf 13.000 60 542 6001 Remove Metal Beam Guard Fence Lf 1,000.000 61 544 6001 Guardrail End Treatment (Install) Ea 11.000 62 544 6003 Guardrail End Treatment (Remove) Ea 8.000 63 560 6003 Mailbox Install-m (Twg-Post) Ty 1 Ea 14.000 64 644 6060 In Sm Rd Sn Sup&Am Tytwt(1)Ws(p) Ea 77.000 65 644 6076 Remove Sm Rd Sn Sup&Am Ea 63.000 66 658 6011 Instl Del Assm (d-Sw)Sz 2(Wc)Gnd(Bi) Ea 15.000 67 658 6061 Instl Del Assm (d-Sw)Sz 1(Brf)Gf2 Ea 15.000 68 658 6073 Instl Om Assm (Om-2y)(Wc)Gnd(Bi) Ea 14.000 69 662 6075 Wk Zn Pav Mrk Remov (w)24"(Sld) Lf 154.000 70 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 170.000 71 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 75.000 72 666 6342 Ref Prof Pav Mrk Ty i(w)4"(Sld)(100mil) Lf 25,841.000 73 666 6344 Ref Prof Pav Mrk Ty i(y)4"(Brk)(100mil) Lf 512.000 74 666 6345 Ref Prof Pav Mrk Ty i(y)4"(Sld)(100mil) Lf 25,043.000 75 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 372.000 76 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 79,384.000 77 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 154.000 78 730 6107 Full - Width Mowing Cyc 2.000 79 734 6002 Litter Removal Cyc 2.000 80 738 6010 Cleaning / Sweeping (Spot) Mi 10.000 81 752 6003 Tree Trimming / Brush Removal Mi 2.480 82 3076 6003 d-Gr Hma Ty-b Pg64-22 (Exempt) Ton 2,841.700 83 3076 6051 d-Gr Hma Ty-d Pg76-22 (Level-Up) Ton 384.100 84 3076 6072 d-Gr Hma Ty-d Pg 76-22 (Exempt) Ton 1,647.400 85 3084 6001 Bonding Course Gal 1,203.000 86 3085 6001 Underseal Course Gal 10,030.000 87 6001 6001 Portable Changeable Message Sign Day 360.000 88 6185 6002 Tma (Stationary) Day 180.000 89 6185 6003 Tma (Mobile Operation) Hr 160.000 90 7251 6002 Subsurface Util Locate (Within Rdbed) Ea 1.000 91

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents