Similar Projects
Upgrade HVAC Compressed Air
Post-Bid
Less than $1,000,000 est. value
Boulder, CO

Domestic Water and Heating Pipe Insulation
Post-Bid
Boulder, CO 80303

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Fairgrounds Exhibit Building Chiller Replacement
Results
Longmont, CO 80501

Air Conditioning - Design Build
Post-Bid
Boulder, Louisville, CO

Notice 20-01-Rfp-Umc-Bldg-Recommissioning
Results
Less than $800,000 est. value
Boulder, CO

Sources Sought - Cryogenic Dilution Refrigerator System
Post-Bid
Boulder, CO

Saint Vrain HUB - AHU Replacement
Results
Longmont, CO 80501

Nist Boulder Building 42 Cooling Tower Capacity Upgrade
Post-Bid
$1,000,000 to $5,000,000 est. value
Boulder, CO 80305

Chiller Replacement
Results
Longmont, CO 80503

Sliding Door
Post-Bid
Longmont, CO

On Call Emergency Board Up Services
Term Contract
Results
Longmont, CO 80501

Purchase and Delivery of Roof Top Unit (RTU) - Lyons High School
Post-Bid
Lyons, CO 80540

Courthouse Third Floor Remodel Mechanical HVAC and Plumbing
Results
Boulder, CO 80302

CP291773 - Camp - CHW Plant Enhancement Project
Post-Bid
Less than $5,000,000 est. value
Boulder, CO 80303

Last Updated 10/23/2020 03:31 PM
Project Title

Replace Windows, Stairs and HVAC at Longmont Readiness Center

Physical Address View project details and contacts
City, State (County) Longmont, CO 80501   (Boulder County)
Category(s) Single Trades
Sub-Category(s) HVAC, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Military and Veterans Affairs (DMVA) requests bids to replace first floor windows, install air conditioning and replace stairs at the Longmont Readiness Center in Longmont CO. The project consists of replacing existing windows with energy efficient and blast resistant windows. An existing wood frame stair will be replaced with a steel stair. Three HVAC split units will be installed to add air conditioning and supplement heat to administrative areas. Site work to include two concrete pads for A/C condensers with protective bollards. The building is approximately 13,250 SF.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents