Similar Projects
Viewhouse Thornton - Thornton, CO
New Construction - 5,167 SF
Conception
$2,000,000 est. value
Thornton, CO 80023

RFP Engineering - Second Creek Farm and Oasis Parks, Trail Fitness Stations and Shade Structures
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Commerce City, CO 80022

Dutch Bros Coffee
New Construction - 950 SF
Design
Less than $500,000 CJ est. value
Brighton, CO 80602

Butterfly Pavilion At Baseline
New Construction, Infrastructure - 81,000 SF
Design
$55,000,000 CJ est. value
Westminster, CO 80030

RFP Engineering - Elm Drive Drainage and Street Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Commerce City, CO 80022

Loomis Park Playground Renovation
Infrastructure, Renovation
Bidding
$400,000 CJ est. value
Thornton, CO 80229

CU Denver College of Engineering, Design, and Computing Building and North Classroom Renovations
New Construction, Renovation, Infrastructure - 72,000 SF
Post-Bid
$58,739,000 CJ est. value
Denver, CO 80204

Quebec Highlands Infrastructure
Infrastructure
Post-Bid
Thornton, CO 80602

Utah Park - Sidewalk and Bridge Abutment Repairs
Renovation, Infrastructure
Results
$300,000 to $335,000 est. value
Aurora, CO 80012

Painted Prairie Public Improvement Authority, Painted Prairie Town Center Park (Block 5)
Infrastructure
Results
$1,356,000 CJ est. value
Aurora, CO 80019

Residence Inn by Marriott
New Construction - 83,300 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Aurora, CO 80012

7-Eleven #41581 / Northglenn
New Construction
Construction
$2,000,000 CJ est. value
Northglenn, CO 80233

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

Fairfax Park Drainage Outlet Reconstruction - City of Commerce City
Infrastructure
Conception
$4,950,000 CJ est. value
Commerce City, CO 80022

Last Updated 07/20/2023 11:01 PM
Project Title

Springs Resort Expansion - Bid Package #4 - Remaining Work

Physical Address View project details and contacts
City, State (County) Pagosa Springs, CO 81147   (Archuleta County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Hotel/Motel, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $66,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of an expansion to the existing Springs Resort Ecoluxe Building. Plans call for a 79,600 square foot building to include a hotel, spa, lobby, and restaurant. The project also will include the construction of 27 hot springs pools and a pumphouse/beverage outbuilding. Bid Package #4 includes: polished concrete, thin stone veneer, flagstone veneer, metal fabrications, metal railings, finish carpentry, wood paneling, wood ceilings, casework, continuous board insulation, foamed in place insulation, air barriers, roofing, metal wall panels, roof pavers, roof hatches, firestopping, fireproofing, joint sealants, expansion joints, elevator door smoke containement system, sliding glass doors, aluminum storefront, aluminum clad wood windows, skylight, glazing, mirrors, shower doors and surrounds, stucco, acoustical ceilings, flooring, FRP, wall paper, painting, division 10 specialties, fireplace, lockers, sauna, plumbing, HVAC, electrical, pavement markings, traffic signage, fencing and gates, planters, landscaping/irrigation, and imported top soil. Questions deadline - 7-11-2023, 2:00 PM due to CM. The official construction start date for the first package is anticipated mid February 2023. Cost estimate = total construction cost estimate. FCI Constructors, Inc. is an Equal Opportunity Employer. WBE/MBE/DBE/SBE firms are encouraged to participate Addendum #1-#3 have been issued as of 7-19-2023.

Details

79,600 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents