Similar Projects
Porteos Filing No. 3, 64Th Avenue (South Side) At Jackson Gap Street Streetlights & Porteos No. 2, 56Th Avenue And Powhaton Road Streetlights
Post-Bid
Greenwood Village, CO

Wrong Way Driving Traffic Control Enhancement Phase 1 Consisting of Signing, Signal Headupgrades and Pavement Markings
Post-Bid
$1,000,000 to $5,000,000 est. value

Batch Signal Construction Phase 2
Results
Less than $623,227 est. value
Centennial, CO 80112

Walden and 104th Traffic Signal
Results
Less than $500,000 est. value
Centennial, CO

Rebuilding the Signals in Three Different Locations
Results
$1,000,000 to $5,000,000 est. value

Traffic Signal Replacement
Results
$1,000,000 to $5,000,000 est. value

RFI 20-082 MM Automated Traffic Management System (ATMS)
Post-Bid

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

2020 Traffic Signal Cleaning and Painting
Post-Bid
Greenwood Village, CO 801123

Chambers Road and Innovation Way Traffic Signal
Results
CO

South Federal Boulevard and West Berry Avenue Pedestrian Traffic Signal SRTS
Results
Littleton, CO

Aurora Signals 2019
Bidding
Less than $1,000,000 est. value

Replacement of Traffic Signal Cabinets, Traffic Signal Controllers, and Installation of Advanced Detection at Various Locations in Region 1
Results
$1,000,000 to $5,000,000 est. value

Stop Bar Vehicle Detection for Signalized Intersections
Post-Bid
Centennial, CO

Wrong Way Driving Traffic Enhancements
Results
$1,000,000 to $5,000,000 est. value

Last Updated 06/15/2020 03:46 PM
Project Title

Traffic Signal Pole Replacement

Physical Address View project details and contacts
City, State (County) Centennial, CO 80112   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $174,555
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall include all labor, equipment and materials necessary to remove existing traffic signal poles, mastarms and/or spanwire; install new concrete caissons; install new signal poles and mastarms; install new pedestrian pushbuttons with signs; and reset existing traffic signal equipment to new poles and mastarms,

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents